SOLUTION: 3 boys are working on a school project. Joseph and Bill can finish the prohectbin 10 days. Bill and Elmer can finish it in 12 days. Joseph and Elmer can finish it in 15 days. If ea
Algebra.Com
Question 1146303: 3 boys are working on a school project. Joseph and Bill can finish the prohectbin 10 days. Bill and Elmer can finish it in 12 days. Joseph and Elmer can finish it in 15 days. If each boy works alone, how long will it take him to finish the project?
Found 2 solutions by josgarithmetic, greenestamps:
Answer by josgarithmetic(39617) (Show Source): You can put this solution on YOUR website!
Each boy's RATE:
x, y, z for Joseph, Bill, Elmer
-
---------this will give value for x, a rate for Joseph; from which you want its reciprocal.
The other two are done similarly.
Answer by greenestamps(13200) (Show Source): You can put this solution on YOUR website!
Here is an alternative to the standard method shown by the other tutor for solving "working together" problems. Many students like this method because it avoids working with those fractions.
Assume it is sensible for the "job" to be done multiple times; then consider the least common multiple of the given times. The LCM of 10, 12, and 15 is 60. So how many of these jobs can each combination of boys do in 60 days?
Joseph and Bill in 60 days can do 60/10 = 6 of these jobs.
Bill and Elmer in 60 days can do 60/12 = 5 of these jobs.
Elmer and Joseph in 60 days can do 60/15 = 4 of these jobs.
So write equations for the numbers of jobs each combination of boys can do in 60 days:
(1) J+B = 6
(2) B+E = 5
(3) E+J = 4
Add the three equations and simplify:
(4) J+B+E = 7.5
Now compare (4) with each of (1), (2), and (3):
E = 7.5-6 = 1.5
J = 7.5-5 = 2.5
B = 7.5-4 = 3.5
Elmer alone can do 1.5 of these jobs is 60 days; so working alone he can complete one job in 60/1.5 = 40 days.
Joseph alone can do 2.5 of these jobs in 60 days; so working alone he can complete one job in 60/2.5 = 24 days.
Bill alone can do 3.5 of these jobs in 60 days; so working alone he can complete one job in 60/3.5 = 120/7 = 17 1/7 days.
ANSWERS:
Elmer: 40 days
Joseph: 24 days
Bill: 17 1/7 days
RELATED QUESTIONS
Joseph can finish a project in 10 hours and Aaron can do the same project in 8 hours. How (answered by solver91311)
Janette can make an afghan in 10 days, Bill in 6, and Sue in 15 days. Bill and Janette... (answered by ankor@dixie-net.com,ikleyn)
2 men and 5 boys together can a finish a piece of work in 4 days ,while 3 men and h boys... (answered by richwmiller)
Q. Bill and James can do together a piece of work in 30 days. James alone can finish the... (answered by ankor@dixie-net.com)
A and B working together can finish the job in 10 days. if A works 4 days and B works 3... (answered by josgarithmetic,ikleyn)
8 boys and 12 girls can finish the work in 10 days, while 6 boys and 8 girls can finish... (answered by ewatrrr)
12 boys and 8 men can finish a piece of work in 5 days.and 8 boys nd 6men can finish it... (answered by Edwin McCravy)
10 men can finish the paint on wall in 15 days. How many men are needed to finish the... (answered by stanbon)
I have tried to solve this, and got an answer of "1.14 days".
But, I am a little bit... (answered by Theo)