SOLUTION: 5 men can prepare 10 toys in 6 days working 6 hours a day. In how many days can 12 men prepare 16 toys working 8 hours a day?

Algebra.Com
Question 1143725: 5 men can prepare 10 toys in 6 days working 6 hours a day. In how many days can 12 men prepare 16 toys working 8 hours a day?

Found 2 solutions by josgarithmetic, ikleyn:
Answer by josgarithmetic(39620)   (Show Source): You can put this solution on YOUR website!
-----------------------------------------------------------------
5 men can prepare 10 toys in 6 days working 6 hours a day.
-----------------------------------------------------------------

Six days at six hours per day makes 36 HOURS.





--------------------------------------------------------------------
In how many days can 12 men prepare 16 toys working 8 hours a day?
--------------------------------------------------------------

x, number of HOURS





Working at 8 hours per day, this is 3 days.

Answer by ikleyn(52806)   (Show Source): You can put this solution on YOUR website!
.

One way to solve it :

Making 10 toys requires  5 men * 6 days * 6 hours = 180 men-hours, according to the first statement.


Hence, making 1 toy requires 180/10 = 18 hours.


Then making 16 toys will take 16*18 = 288 hours.


12 men, working 8 hours per day, will do it in   = 3 days.


Answer.  In 3 days.


Another way to solve the problem is THIS :

Based on the first statement, rate of work of 1 man is   =  =  of the toy per hour.


If "x" is the number of days under the question, then the rate of work of one man is   =  of the toy per hour.


Rate of work is assumed to be the same in both cases; it gives you an equality  (proportion)


      = .


From the proportion


     1*96x = 18*16,   or   x =  = 3.


You get the same answer :  3 days are needed.

You can use either of the two ways/methods to solve the problem.

---------------

See the lesson
    - Rate of work problems
in this site,  where you can find many other similar solved problems.


RELATED QUESTIONS

10 men working 6 hours a day can complete a work in 18 days. How many hours a day must 15 (answered by vksarvepalli)
12 men working 7 hours a day can finish a job in 6 days. How many more hours a day must 8 (answered by ankor@dixie-net.com)
15 men working 6 hours a day can do a piece of work in 20 days. how many men working 8... (answered by sadike007)
If a group of 24 men working 8 hrs a day can complete building a wall in 12 days then in (answered by ankor@dixie-net.com,DEEPAK K)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
15 men working 7 hours a day can finish a piece of work in 15 days. How many days will... (answered by ankor@dixie-net.com)
if 4 men can mow certain piece of land in 6 days ,working 10 hours a day, how many days... (answered by Alan3354,stanbon)
If 15 men , woking 9 hours a day, can reap a field in 16 days , in how many days will 18... (answered by ankor@dixie-net.com)
Q1 ) 24 men working at 8 hours per day can do a piece of work in 15 days. In how many... (answered by Alan3354)