SOLUTION: Working together, Tumelo and Jan can sand a floor in five eights of the time that it takes Jan to sand it by himself. Jan takes 6 hours to sand the floor alone. How long does it t

Algebra.Com
Question 1140362: Working together, Tumelo and Jan can sand a floor in five eights of the time that it takes Jan to sand it by himself. Jan takes 6 hours to sand the floor alone. How long does it take Thumelo to sand the floor by himself
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Jan's rate of working is
[ 1 floor sanded ] / [ 6 hrs ] =
Let = Thumelo's time working alone

Add their rates of working to get their rate working together

Multiply both sides by



It takes him 10 hrs working alone
---------------------------------------
check:

Multiply both sides by


OK

RELATED QUESTIONS

Working together Tumelo and Jan can sand a floor in five-eighths of the time that it... (answered by ankor@dixie-net.com,checkley79)
It takes Joan 5 h to paint the porch, while Jan can do it in 4 h. How long will it take... (answered by jorel1380)
Jon can paint a house in 4 hours. Jan can paint it in 6. How long would it take both to... (answered by robertb)
If Jan can weed the garden in 2 hours and her husband can weed it in 1 hour and 30... (answered by ankor@dixie-net.com)
Jan can write a program in 9 days, if Dan helps her it takes 6 days. How long does it... (answered by richard1234)
I'm really stuck with figuring this story problem can you help? it goes like this:WORKING (answered by solver91311,Mathtut,ptaylor)
From Jan 1996 to Jan 2001 the number of internet hosts increased by 1054%. There were... (answered by EduDragon)
If jan can paint a house in 4 hours and jim can paint a house in 6 hours, how long will... (answered by nerdybill)
I have been working on this math problem and I got an answer, but I am not sure if it is... (answered by stanbon,solver91311)