Question 1122907: when a b and c work together they finish installing a garden in 3 days. The job could be completed if A worked 4 days alone and C worked 10 days alone, or if B worked 5 days alone and C worked 3 days alone. How many days would it take each worker, alone, to complete garden?

Answer by ikleyn(52803)   (Show Source): You can put this solution on YOUR website!
.
Let "a" be the rate of work of A;
    "b" ---------- ''--------- B:,  and
    "c" ---------- ''--------- C.


Then from the condition, you have these three equations for 3 unknowns


3a + 3b +  3c = 1,    (1)

4a      + 10c = 1,    (2)

     5b +  3c = 1.    (3)


The setup is done, which is the key step in the solution.


Now you can use any method to solve the system. For example, you can express "a" via "c" from (2) and express "b" via "c" from (3), 
and then substitute it into eq(1) to find "c".


As soon as you find "c", you will be able to find each "a" and "b" separately from eq(2) and eq(3) respectively.


Answer.  a = ,  b = ,  c = .


         It means that A needs 9 days;  B needs 6 days,  and C needs 18 days to complete the job, if everybody works alone.



RELATED QUESTIONS

When A,B and C work together, they can finish installing the garden in 3 days. The job... (answered by ikleyn)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
A and B working together can finish the job in 10 days. if A works 4 days and B works 3... (answered by josgarithmetic,ikleyn)
A,B,and C undertook a construction project. A and B worked together the first 6 days and... (answered by ankor@dixie-net.com)
Two workers A and B together could finish a work in 8 days. They worked together for 6... (answered by josgarithmetic,ikleyn)
Tow workers A and B together could finish a work in 8 days. They worked together for 6... (answered by ikleyn)
16 men can finish a work in 12 days. After they worked for 4 days, some more men joined... (answered by ikleyn,josgarithmetic)
Two workers and B together could finish a work in 8 days. They worked together for 6 days (answered by KMST)
Joel can finish a work in 10 days, after he has worked for 2 days, Sam came to help him... (answered by richwmiller)