SOLUTION: A man can do a job in 10 hours and his younger son can do it in 12 hours. After the father and his younger son have been working for 1 hour, the older son joins them, and the three

Algebra.Com
Question 1101866: A man can do a job in 10 hours and his younger son can do it in 12 hours. After the father and his younger son have been working for 1 hour, the older son joins them, and the three completed the job in 3 more hours. How long will it take the older son to do the job?

Found 3 solutions by josmiceli, greenestamps, josgarithmetic:
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Man's rate is:
[ 1 job ] / [ 10 hrs ]
Younger son's rate is:
[ 1 job ] / [ 12 hrs ]
Let older son's rate =
[ 1 job ] / [ t hrs ]
----------------------
Let = the fraction of the
job man and younger son get done
in 1 hr
Add their rates to get rate working together

Multiply both sides by


is the fraction that gets done.
There is of the job left to do
------------------------------------------


Multiply both sides by




Working alone, the older son
can do the job is 11 hrs 15 min
------------------------------
Get another opinion if needed

Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!


The other tutor's answer is right.

Here is my solution, by a slightly different method that looks easier than what they did.

As the other tutor showed in her calculations, the man and the younger son can do 11/60 of the job in 1 hour.

When the older son joins them, the job is finished in another 3 hours.

That means the man and his younger son work for 4 hours, and the older son works for 3.

Since the man and the younger son do 11/60 of the job in 1 hour, they do 44/60 of the job in 4 hours.

That means the older son does 16/60 of the job in 3 hours, which means 16/180 of the job in 1 hour.

So the number of hours the older son alone would need to do the job alone is 180/16 = 11.25 hours.

Answer by josgarithmetic(39618)   (Show Source): You can put this solution on YOUR website!
Father and young son work together 1 hour.
Father, young son, and older son all work together 3 hours.

x, time for older son to do ONE job, working alone



Simplify and solve for x.

RELATED QUESTIONS

A man can mow his lawn in 4 hours. His son can do the job in 3 hours. If the son takes... (answered by VFBundy)
A woman can do a certain job in 10 hr and the younger daughter can do it in 12 hr. After... (answered by richwmiller)
A man can paint a room in 8 hours. It takes his son 12 hours to do the same job. After... (answered by josgarithmetic)
A man can paint a room in 8 hours. It takes his son 12 hours to do the same job. After... (answered by josmiceli)
1) A customer deposits Php 8000 in one simple interest account and Php 2000 in a second... (answered by josmiceli)
A man can paint a room by himself in 8 hours and it takes his son 12 hours to do the same (answered by Earlsdon)
2. A man can do a job in h hours alone and his son can do it in 2h hours alone. Together, (answered by majo89)
2. A man can do a job in h hours alone and his son can do it in 2h hours alone. Together, (answered by ankor@dixie-net.com)
A father and his son can dig a well if the father work 6 hours and his son does 12 hours... (answered by ikleyn)