SOLUTION: if a road crew painted 450 yards of lines on a new road,how many meters did they paint?
Algebra.Com
Question 1079166: if a road crew painted 450 yards of lines on a new road,how many meters did they paint?
Answer by Fombitz(32388) (Show Source): You can put this solution on YOUR website!
There are 39.37 inches in a meter and 36 inches in a yard.
So then,
xx
RELATED QUESTIONS
A road crew can pave 1.5 miles of road in an eight hour shift. If they were stopped after (answered by jojo14344)
A repaving crew is putting a new surface on 79 kilometers of road. They have completed 28 (answered by josmiceli)
A repaving crew is putting a new surface on 79 kilometers of road. They have completed... (answered by josmiceli)
A construction crew has just finished building a road. The crew worked for
5 5/6 days.... (answered by ikleyn)
A machine is used to paint a white line on a road. The operator estimates that he has... (answered by math_helper)
A 15-person road crew is scheduled to finish repairing a highway in 12 days. On the... (answered by robertb)
One road crew constructs 450 m of road bed in 12 h. If another crew works at the same... (answered by Alan3354,josgarithmetic)
15 kilometers. The crew worked for 4 and 1/6 days. How many kilometers of road did they... (answered by Alan3354)
A crew repairs 1/12 mile of road each day, how long will it take the crew to repair a 3/4 (answered by rfer)