SOLUTION: The workman A finishes the job 2 hours faster than the workman C, and 1 hour slower than workman B. If workman A and B work together the job will be finished in 1 hour and 12 minut
Algebra.Com
Question 1077702: The workman A finishes the job 2 hours faster than the workman C, and 1 hour slower than workman B. If workman A and B work together the job will be finished in 1 hour and 12 minutes. For how long will all workmen finish the job
Found 2 solutions by josgarithmetic, josmiceli:
Answer by josgarithmetic(39630) (Show Source): You can put this solution on YOUR website!
Time for A to do 1 job, x.
Time for B to do 1 job, x-1.
Time for C to do 1 job, x+2.
-
Workman A and B tegether:
Solve this for x, and then evaluate the one-job times for B and C.
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Let = time in hrs for A to finish the job
= time in hrs for B to finish the job
= time in hrs for C to finish the job
-------------------------------------------
A's rate of working:
[ 1 job ] / [ t hrs ]
B's rate of working:
[ 1 job ] / [ t-1 hrs ]
C's rate of working:
[ 1 job ] / [ t + 2 hrs ]
----------------------
Add the rates for A and B to get
their rate working together
( I coverted minutes to hrs )
Multiply both sides by
Solve with quadratic formula
hrs ( too small, gives negative times )
hrs
hrs
hrs
-------------------------
Add the rates for all three
Let = time in hrs for all three to finish job
Multiply both sides by
hrs
min
min
All 3 working together take 58.06 min
Check the math
( kind of a strange answer )
and get another opinion if possible
RELATED QUESTIONS
Workman A's rate of doing work is twice that of Workman B's. One day, A & B work together (answered by ankor@dixie-net.com)
Workman A's rate of doing work is twice that of Workman B's. One day, A & B work... (answered by josmiceli)
Two workmen have to finish a job. If they work together the job will be done in 12 days.... (answered by josgarithmetic)
A is thrice as good as workman as B and therefore is able to finish a job in 60 days less (answered by richwmiller)
Hi, I am having difficulty putting this problem into an equation even though I know the... (answered by ankor@dixie-net.com,scott8148)
the incidence of occupational disease in an industry is such that the workman has 20... (answered by Boreal)
If A can finish a job 50% faster than B and 20% faster than C, and together they can... (answered by ankor@dixie-net.com)
Dear...
A finishes a paint job in two hours less than B. C paints as quickly as A and B (answered by josgarithmetic)
One runner finishes a race in one hour. A second runner finishes 20 minutes later. If the (answered by ankor@dixie-net.com)