SOLUTION: A crew of ten workers was hired to complete a job in 8 days. After working for two days, there was a new request to complete this job in two days. How many more workers need to be

Algebra.Com
Question 1067620: A crew of ten workers was hired to complete a job in 8 days. After working for two days, there was a new request to complete this job in two days. How many more workers need to be hired to finish this job in 2 days?
Found 2 solutions by josmiceli, MathTherapy:
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
I'm assuming that the 10 workers, working at
their normal rate would finish the job in exactly
8 days.
----------------------
The rate of working for 1 worker is:
[ 1/10 of the job ] / [ 8 days ] = [ 1 job ] / [ 80 days ]
This is also [ 1/80 of the job ] / [ 1 day ]
In 2 days, the fraction of the job that gets done is:

The leaves of the job left
-----------------------------------
Now the rate has to be jobs/days
Let = the number of additional workers needed to
finish the job in 2 days
-----------------------------------

Multiply both sides by


-------------------------------------
29 additional workers need to be added
-------------------------------------
check answer: there is a total of workers to
do 39/40 of the job in days
-------------------------------
Each worker will do of the job in days
That is of the job in 1 day
This agrees with my original calculation
-------------------------------
Definitely try to get another opinion on this!






Answer by MathTherapy(10552)   (Show Source): You can put this solution on YOUR website!

A crew of ten workers was hired to complete a job in 8 days. After working for two days, there was a new request to complete this job in two days. How many more workers need to be hired to finish this job in 2 days?
Fraction of job done by 10 workers in 2 days:   
Fraction of job remaining after 10 workers worked 2 days:
Now, of job remains to be done in 2 days, by 10 + A, with A being the additional workers
This will take: , or a total of 30 (10 + 20) workers to complete the job in 2 days.
RELATED QUESTIONS

twelve workers can complete a job in six days. after working two days four workers are... (answered by ewatrrr)
two teams of construction workers had to renovate for 12 days. after 8 days during which (answered by josgarithmetic,ikleyn)
an electrical contractor is planning to complete a lighting job by useing two separate... (answered by richwmiller)
It took a crew of 16 workers 2.75 days to do 1/2 the job. Working at the same rate, how... (answered by josgarithmetic,josmiceli)
Two crews can complete a job in 45 days when working together. On their own, one crew... (answered by ankor@dixie-net.com)
5 men are hired to complete a certain job. if an additional men is hired, the job can be... (answered by ikleyn)
Five workers have been hired to complete a job. If one additional worker is hired, they... (answered by Edwin McCravy,math_tutor2020,josgarithmetic,ikleyn)
Five workers have been hired to complete a job. If one additional worker is hired, they... (answered by ikleyn,math_tutor2020)
All members of a crew work at the same pace. If only 4 of them are working, they complete (answered by josgarithmetic)