Answer by josgarithmetic(39617) (Show Source): You can put this solution on YOUR website!
If A and B are their individual rates in WORK per DAYS, then this system describes the situation:
SIMPLFICATIONS
18A+18B=1
-
10A+10B+12B=1
10A+22B=1
-
Solve this system for A and B, but you will want the reciprocal of A, if the question you want is, how much time does "A" need alone to do one piece of work.
RELATED QUESTIONS
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
a and b can each do a piece of work in 15 days and 18 days. if a works for 10 days, how... (answered by stanbon)
A can do a piece of work in 12 days and B can do a piece of work in 18 days. They started (answered by dkppathak)
A, B and C together can complete a piece of work in 10 days. All the three started... (answered by LinnW)
A takes 20 days to complete a job X. B takes 30 days to complete the same job X. How... (answered by CubeyThePenguin)
A can do a piece of work in 30 days,and B can do the same work in 40 days,if both do... (answered by richwmiller)
A takes 10 more days to do a job than B they both do a job in 12 days. in how many days B (answered by ikleyn,Theo)
A does 3/10 of a work in 6 days .He then calls in B and they finish the work in 7 days... (answered by ankor@dixie-net.com)
Ramesh , Suresh and Harish can do a piece of work in 15 days, 10 days and 6 days... (answered by mananth)