SOLUTION: What part of the job can Hanz do per hour if the whole job takes.
1. 5 hours
2. x hours
3. (x + 1) hours
4. 1/2 hour
5. 2/3 hour
Algebra.Com
Question 1063407: What part of the job can Hanz do per hour if the whole job takes.
1. 5 hours
2. x hours
3. (x + 1) hours
4. 1/2 hour
5. 2/3 hour
Answer by math_helper(2461) (Show Source): You can put this solution on YOUR website!
If he does the job in 1 hr he can do 1/1 = 1 job per hour
If he does the job in 2 hrs he can do 1/2 = 1/2 job per hour
--
The pattern is if x hours to do the job, he does 1/x job per hour.
--
1. If he takes 5 hours, he can do 1/5 job per hour
--
I'll let you finish, it will be more rewarding for you if you finish it.
RELATED QUESTIONS
It takes Joe x hours to do a job. What part of the job can he do in 1 hour?
Jane takes (answered by ankor@dixie-net.com)
James can paint a room in 4 hours, while Mike can paint the same room in 5 hours. Working (answered by josgarithmetic)
Jane takes 4 hours to do a job that Alice can do in 3 hours. If Jane works 1/2 hour... (answered by ankor@dixie-net.com)
Bob can do a job in 1 hour, John can do the same job in 2 hours, Lisa can do the same job (answered by kev82)
An engineer takes 1 hour longer to do a job than the other engineer. Working together... (answered by stanbon)
If John takes 4 hours to build a tree house and if Kevin takes 5 hours to build a tree... (answered by Alan3354)
One shop will charge $325 for a job that takes 4 1/3 hours. A second shop can do the... (answered by unlockmath)
It takes 5 hours for John to do some job. he worked for an hour , and then Mike joined .... (answered by venugopalramana)
I work at most 25 hours per week and earn at least $150 per week. I have two jobs, one... (answered by josgarithmetic)