SOLUTION: A construction company needs to remove 30 tons of dirt from a construction site. They can remove 3/5 tons of dirt each hour. How long will it take to remove the dirt?
Algebra.Com
Question 1054672: A construction company needs to remove 30 tons of dirt from a construction site. They can remove 3/5 tons of dirt each hour. How long will it take to remove the dirt?
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
30/(3/5) hours
RELATED QUESTIONS
a construction worker needs to improve 120 ft^3 of dirt by using a wheelbarrow. one... (answered by ikleyn,Alan3354)
Please solve:
Two front-end loaders can remove 3/4 of the dirt from an excavation in 1 (answered by checkley71)
The Keiko Construction Company is building a house. They need to dig a rectangular... (answered by cathieb1225)
Construction: Dirt must be excavated for the foundation of a building 30 yards by 15... (answered by stanbon)
between 15.000 yd 3 and 16.000 yd 3 of earth must be tucked away from a construction site (answered by ikleyn)
A building contractor is to dig a foundation 40 feet long, 30 feet wide, and 14 feet... (answered by macston)
At a construction site, the daily requirement of gneiss
(in metric tons) is a random... (answered by CPhill)
A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 9 feet deep. (answered by mananth)
A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 6 feet deep. (answered by josmiceli)