Question 1049521: Two employees are painting walls. A takes twice as long as B to paint the same area. During a typical 8-hour day, A works the full 8 hours, but B takes a 2-hour break. A paints one way in a day. How many walls do both employees paint together in 1 day? I need an explanation on how to ...
Answer by Edwin McCravy(20054)   (Show Source): You can put this solution on YOUR website!
Two employees are painting walls. A takes twice as long as
B to paint the same area. During a typical 8-hour day, A
works the full 8 hours, but B takes a 2-hour break. A paints
one wall in a day. How many walls do both employees paint
together in 1 day? I need an explanation on how to ...


A paints 1 wall in 8 hours.
B can paint 1 wall in 4 hours, (since he paints twice as fast as A.)
Therefore B paints 0.5 wall in 2 hours.
And therefore B paints 1.5 walls in 6 hours.
In 1 day A paints for 8 hours and B paints for 6 hours
So in 1 day A paints 1 wall and B paints 1.5 walls.
So in 1 day they paint 1 + 1.5 = 2.5 walls 

Edwin

RELATED QUESTIONS

The length and width of a rectangular swimming pool are each doubled, while the depth... (answered by chriswen)
Painters A and B can paint a wall in 10 hours when working at the same time. Painter B... (answered by jorel1380)
painters A and B can paint a wall in 10 hours when working at the same time. Printer B... (answered by rwm)
Painting - You and your friend are painting the walls in your apartment. You estimate... (answered by ptaylor)
you and your friend are painting the walls of your apartment. You estimate that there is... (answered by solver91311)
it takes a painter A 3 hrs to paint a certain area of a hhouse.it takes painter B 5 hrs... (answered by checkley71)
Dear... A finishes a paint job in two hours less than B. C paints as quickly as A and B (answered by josgarithmetic)
The amount of paint needed to cover the walls of a room varies jointly as the perimeter... (answered by rfer)
It takes machine A twice as long to produce 10,000 bolts as it takes machine B. Together... (answered by richwmiller)