SOLUTION: Bill takes 2hours and Monica takes 1hour to wash a car. How long will both take to do the same?
Algebra.Com
Question 104888: Bill takes 2hours and Monica takes 1hour to wash a car. How long will both take to do the same?
Answer by oberobic(2304) (Show Source): You can put this solution on YOUR website!
Combined work efforts are similar to mixture problems. You need to figure out the "pure" rate of work per hour by each person.
In this case, Bill takes 2 hr to do 100% of the job, so he does 50% per hr.
In contrast, Monica does 100% of the job in 1 hr, so she does 100% per hr.
Working together they do the full job.
.5x +x = 1
1.5x = 1
x = 1/1.5 = 2/3 hr
ALWAYS check:
2/3*.5 = 1/3 = Bill's contribution
2/3*1 = 2/3 = Monica's contribution
1/3 +2/3 = 1 =full job.
Check.
RELATED QUESTIONS
Monica takes one hour to wash a car and Hilary takes one hour to wash a car. If they... (answered by ewatrrr)
Rate of work problems: I have no experience with them and I was given the below problem... (answered by ewatrrr)
It takes Bill 2hours longer to do a certain job than it takes Cindy . They worked... (answered by josgarithmetic)
It takes you 15 minutes to wash a car and it takes a friend 6 minutes to wash a car. How... (answered by josmiceli)
It takes you 15 minutes to wash a car and it takes a friend in 9 minutes to wash a car... (answered by ewatrrr,richwmiller)
Jim can wash a car in 45 minutes and Bill can wash the same car in 25 minutes, how long... (answered by josgarithmetic)
It takes a man 4 hours to wash and wax the family car. If his teenage son helps him, it... (answered by ewatrrr)
It takes a man 5 hours to wash and wax the family car. If his teenage son helps him, it... (answered by josgarithmetic)
Al can wash the family car in 60 minutes while it takes his little brother Bill 80... (answered by ewatrrr)