SOLUTION: Three men do a piece of work,the first does 7/15,the second does 5/9 of the reminder while the third does the rest.if the rest done by the third person equal 24 units,find the whol

Algebra.Com
Question 1036541: Three men do a piece of work,the first does 7/15,the second does 5/9 of the reminder while the third does the rest.if the rest done by the third person equal 24 units,find the whole piece of work? From Esther.
Found 2 solutions by JBarnum, MathTherapy:
Answer by JBarnum(2146)   (Show Source): You can put this solution on YOUR website!
my first question is which part did Esther do? makes it difficult to solve now doesnt it.
this is simply a work backwards problem if R = remainder then of the remainder is and of the remainder would be
so that and and so and means
If T = Total then
multiply by 15
divide by 8

so
person 1 did 7/15ths of the work meaning units
Person 2 did 5/9ths of the remainder meaning units
Person 3 did units
which one is Esther....no clue...lol

Answer by MathTherapy(10809)   (Show Source): You can put this solution on YOUR website!

Three men do a piece of work,the first does 7/15,the second does 5/9 of the reminder while the third does the rest.if the rest done by the third person equal 24 units,find the whole piece of work? From Esther.
Whole piece of work:  

RELATED QUESTIONS

Please how do I solve the following problem: Three men do a piece of work, the first does (answered by mananth)
three men do a piece of work,the first does 7/15,the second does 5/6 of the remainder... (answered by richwmiller)
Jane cuts a piece of rope into three pieces. The second piece is 7 times as long as the... (answered by josgarithmetic)
recto ponciano invests one third of his money at 8% interest, three fifths at 7% and the... (answered by ikleyn)
The three packages weigh a total of 15 pounds. The first package weighs twice as much as... (answered by ikleyn)
A contractor undertook to do a certain piece of work in 9 days. He employed certain... (answered by ikleyn,Theo,greenestamps,josgarithmetic,Edwin McCravy)
If 15 men can do a piece of work in 90 days, in how many days can 30 men do the same... (answered by stanbon,richwmiller)
A 9-foot board is cut into three pieces. The second piece is twice as long as the first... (answered by jorel1380)
If a man can do a piece of work in 15 days & another person does the same work in 20... (answered by richwmiller)