SOLUTION: if it takes 3 men 11 days to dig a tench , the number of days it will take 5men to diag the same tench ,assuming all work is done at the same rate of speed?

Algebra.Com
Question 1035697: if it takes 3 men 11 days to dig a tench , the number of days it will take 5men to diag the same tench ,assuming all work is done at the same rate of speed?
Answer by josgarithmetic(39627)   (Show Source): You can put this solution on YOUR website!
...,assuming all work is done at the same rate of speed?

Under that condition, the one trench still is dug in the same 11 days. Did you really mean something else?

Throw away that given assumption and you have a more useful exercise problem.
Let r be the rate of work for ONE MAN, and expect each man works at this rate r, in the unit TRENCH per DAYS, and let t be the number of unknown days asked. The first two parts of the description will then give the system of equations,


RELATED QUESTIONS

if 4 men work for 6 hours a day for 3 days to dig a hole. how long will it take 12 men to (answered by macston)
if it takes 8 men 9 days to dig a tunnel how long will it take 6 men to dig the same... (answered by ikleyn)
If 6 men can dig a hole in 10 days how many days will it take 12 men to dig the same hole (answered by ikleyn)
6 men can dig a trench in 3 days. How many days will it take 9 men to dig the same trench (answered by Edwin McCravy)
10 men take 7 days to dig a hole. how many days will it take 4 men to dig the same hole... (answered by stanbon)
It takes 5 men to paint 2 identical houses in 3 days. Assuming that all men work at the... (answered by stanbon)
it takes 3 men to dig 2 identical trenches in 5 hours.If all the men work at the same... (answered by josmiceli,MathTherapy)
If 6 men take 3 days to dig 8 ditches, then how long would it take 4 men to dig 10... (answered by Fombitz,Edwin McCravy)
A soakaway was dug by 5 men in 24 days.How many days would it take 15 men to dig,if they... (answered by josgarithmetic,MathLover1,ikleyn)