SOLUTION: A 15-person road crew is scheduled to finish repairing a highway in 12 days. On the morning of the fifth day, several new workers join the crew and, together, they complete the rem
Algebra.Com
Question 1032312: A 15-person road crew is scheduled to finish repairing a highway in 12 days. On the morning of the fifth day, several new workers join the crew and, together, they complete the remaining repairs in 6 days. How many new workers joined the crew?
Answer by robertb(5830) (Show Source): You can put this solution on YOUR website!
There is a requirement of 15*12 = 180 person-days to finish repairing the highway. Since it has been 4 days that the crew has been working, 4*15 = 60 person-days have already been accomplished. The remaining work is done by 15+x persons in 6 days. Hence,
60 + 6(15+x) = 180
==> 6(15+x) = 120
==> 15+x = 20
==> x = 5.
Therefore five new workers joined the crew.
RELATED QUESTIONS
A repaving crew is putting a new surface on 79 kilometers of road. They have completed... (answered by josmiceli)
A repaving crew is putting a new surface on 79 kilometers of road. They have completed 28 (answered by josmiceli)
a crew of four workers is working on installing a roof on a house. The work is equally... (answered by josgarithmetic)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
A construction crew is lengthening a road that originally measured miles. The crew is... (answered by josgarithmetic)
A construction crew is lengthening a road that originally measured 52 miles. The crew is... (answered by ikleyn)
A crew repairs 1/12 mile of road each day, how long will it take the crew to repair a 3/4 (answered by rfer)
A construction crew built 1/4 miles of road in 1/8 days what is the unit rate in miles... (answered by Alan3354)
A contractor agrees to lay a road 3000m long in 30 days. 50 men are employed and they... (answered by josgarithmetic,MathTherapy)