SOLUTION: Uncle Donald could do 2 jobs in 3 days and Cousin Kelly could do 4 jobs in 7 days. Cousin Kelly worked alone for 3 days before Uncle Donald joined in. How long would they have to w

Algebra.Com
Question 1030169: Uncle Donald could do 2 jobs in 3 days and Cousin Kelly could do 4 jobs in 7 days. Cousin Kelly worked alone for 3 days before Uncle Donald joined in. How long would they have to work together to complete a total of 8 jobs?
---I have an idea of what must be done to solve this problem, but I need clarification. An explanation would be amazing. Thanks!

Found 3 solutions by ankor@dixie-net.com, ptaylor, stanbon:
Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
Uncle Donald could do 2 jobs in 3 days and Cousin Kelly could do 4 jobs in 7 days.
Find how long each will take to do one job
Donald: = 1.5 days per job
Kelly: = 1.75 days per job
:
Cousin Kelly worked alone for 3 days before Uncle Donald joined in.
How long would they have to work together to complete a total of 8 jobs?
let t = how long they need to work together to complete 8 jobs
+ = 8
multiply equation by the least common denominator; 2.625
2.625* + 2.625* = 2.625(8)
Cancel the denominators
1.5(t+3) + 1.75t = 21
1.5t + 4.5 + 1.75t = 21
3.25t = 21 - 4.5
3.25t = 16.5
t = 16.5/3.25
t = 5.1 days working together
:
:
:
Confirm this solution: Kelly worked 5.1 + 3 = 8.1 days
8.1/1.75 = 4.6 jobs
5.1/1.5 + 3.4 jobs
--------------------
total jobs: 8.0

Answer by ptaylor(2198)   (Show Source): You can put this solution on YOUR website!
Let x=amount of time it takes working together for them to complete a total of 8 jobs
Uncle Donald works at the rate of 2/3 of the job per day
Cousin Kelly works at the rate of 4/7 of the job per day
In three days, Cousin Kelly did (4/7)*3=12/7 of the jobs, leaving (8=56/7)
(56/7 - 12/7)=44/7 of the jobs yet to be completed
Working together, they work at the rate of (2/3)+(4/7)=(14/21)+(12/21)=26/21 of the jobs per day
Soooooo our equation to solve is:
(26/21)*x=44/7 multiply each side by 21 to get rid of fractions
26x=132
x=5.08 days
hope this helps----ptaylor

Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!

Uncle Donald could do 2 jobs in 3 days and Cousin Kelly could do 4 jobs in 7 days. Cousin Kelly worked alone for 3 days before Uncle Donald joined in. How long would they have to work together to complete a total of 8 jobs?
-----------------
Donald rate:: 2/3 job/days
Kelly rate:: 4/7 job/day
Together rate::1/x job/day
Kelly in 3 days does 3(4/7) = 12/7 jobs
------
Equation:
rate + rate = together rate
2/3 + 4/7 = 1/x
14x + 12x = 21
26x = 21
x = 21/26 days/job
together rate:: 26 job/ 21 day or 1/(21/26) job/day
----------------------------
Complete 8 jobs if Kelly has completed 12/7 jobs
x(1/(21/26)) = 8 - (12/7)
------
26x/21 = (56-12)/7
-----
26x = 3(44)
x = 5.077 days to finish the 8 houses
-----
Cheers,
Stan H.
-----------

RELATED QUESTIONS

Mary can finish an embroidery work in 10 days. After working for 3 days, Mary's cousin... (answered by scott8148)
Joel can finish a work in 10 days, after he has worked for 2 days, Sam came to help him... (answered by richwmiller)
Chere can do 2 jobs in 3 days, and Stacey can do 5 jobs in 6 days. Chere works for 3... (answered by ikleyn)
Five workers can do 7 jobs in 3 days. How many days will it take 10 workers to do 14... (answered by ankor@dixie-net.com)
Robilll can do 2 jobs in 3 days, and Burray can do 5 jobs in 6 days. Robill works for 3... (answered by stanbon)
Robil can do 2 jobs in 3 days, and Buray can do 5 jobs in 6 days. Robil works for 3 days... (answered by nerdybill,stanbon)
when a b and c work together they finish installing a garden in 3 days. The job could be... (answered by ikleyn)
When A,B and C work together, they can finish installing the garden in 3 days. The job... (answered by ikleyn)
Mudog can do 8 jobs in 3 days, and jimmy can do 5 jobs in 2 days. Thirty nine jobs need... (answered by josmiceli)