SOLUTION: Peter can do a piece of work in 8 days, sam in 10 days and john in 16 days. Sam and john work together for 4 days and then john is replaced by peter. Find when the work will be fin

Algebra.Com
Question 1025939: Peter can do a piece of work in 8 days, sam in 10 days and john in 16 days. Sam and john work together for 4 days and then john is replaced by peter. Find when the work will be finished.
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Peter's rate:
[ 1 job done ] / [ 8 days ]
Sam's rate:
[ 1 job done ] / [ 10 days ]
John's rate:
[ 1 job done ] / [ 16 days ]
----------------------
Let = the fraction of the job that
Sam and John get done in days
---------
Add their rates of working to get their
rate working together

Multiply both sides by

Multiply both sides by



This is the fraction of the job Sam and John
complete in days
there is of the job left
------------------------
Let = time in days for Peter and Sam to
do of the job


Multiply both sides by




-----------------
The job gets done in
5 and 5/9 days
Hope I got it -get a 2nd opinion, too.

RELATED QUESTIONS

peter can do a piece of work in 8 days sam in 10 days and john in 16 days sam adams... (answered by josgarithmetic)
Sam takes 6 days less than the number of days taken by John to complete a piece of work.... (answered by stanbon)
Sam takes 6 days less than the number of days taken by John to complete a piece of work.... (answered by ankor@dixie-net.com)
John can do a piece of work in 8 days and peter can do the same piece of work in 6... (answered by Fombitz)
how to solve sam can do a work in 3 days and john can do that work in 5 days,how many... (answered by vleith,richwmiller)
Joel can finish a work in 10 days, after he has worked for 2 days, Sam came to help him... (answered by richwmiller)
A can do a piece of work in 16 days and B can do it in 20 days. These worked together for (answered by robertb)
john can finish a piece of work in 6 days, martin in 8 days and raymund also in 8 days.... (answered by josgarithmetic)
john can finish a piece of work in 6 days, martin in 8 days and raymund also in 8 days.... (answered by josgarithmetic)