SOLUTION: 3 men can do a job for 12 days. If 2 of the men work twice faster than the 3rd, how long would it take one of the faster men to do the job?

Algebra.Com
Question 1015101: 3 men can do a job for 12 days. If 2 of the men work twice faster than the 3rd, how long would it take one of the faster men to do the job?
Answer by josgarithmetic(39631)   (Show Source): You can put this solution on YOUR website!
Let r be the slow man rate and then 2r is the fast man rate.

You have one slow man and two fast men, and combined, this group rate is .

The group of men can do 1 job in 12 days;
.



, meaning the slow man does 1 job in 60 days.

Either of the FASTER men will simply need HALF those number of days for the 1 job, meaning 30 days.

RELATED QUESTIONS

three men do a job in 12 days.Two of the men work twice ass fast as third.How long will... (answered by ankor@dixie-net.com)
three men do a job in 12 days.Two of the men work twice as fast as third.How long will it (answered by richwmiller)
Three workers can do a job in 12 days. Two of the workers work twice as fast as the... (answered by josgarithmetic)
Two men painted a room in 3 hours. How long would it take each of them while working... (answered by nerdybill)
Q1. if 2 men or 3 women or 6boys can do a piece o work in 70 days,in what time would 2... (answered by ankor@dixie-net.com,vvnrichards)
if 9 men can do a piece of work for 20 days, how long would it take 4 men to do do,... (answered by josgarithmetic)
one man & 2 boys can do a piece of workin 12 days, which can also done by 3 men & 1 boy... (answered by stanbon)
if rob sarah and George can complete a job in 12 days and rob can work 6 times faster... (answered by josgarithmetic,MathTherapy)
If 2 men take 8 days to mow a field and the faster man can do it alone in 12 days how... (answered by ankor@dixie-net.com)