SOLUTION: A civil engineer relates the thickness T, in inches, and height H, in feet, of a square wooden pillar to its crushing load L, in tons, using the model T = [(LH^2)/25)]^(1/4).

Algebra.Com
Question 1207669: A civil engineer relates the thickness T, in inches, and height H, in feet, of a square wooden pillar to its crushing load L, in tons, using the model
T = [(LH^2)/25)]^(1/4).
If a square wooden pillar is 4 inches thick and 10 feet high l, what us the crushing load?


Here is my set up:

4 = [(L(10)^2)/25)]^(1/4).

Is this correct?

Thanks.

Answer by ikleyn(52781)   (Show Source): You can put this solution on YOUR website!
.
A civil engineer relates the thickness T, in inches, and height H, in feet, of a square wooden pillar to its crushing load L, in tons, using the model
T = [(LH^2)/25)]^(1/4).
If a square wooden pillar is 4 inches thick and 10 feet high H, what us the crushing load?

Here is my set up:

4 = [(L(10)^2)/25)]^(1/4).

Is this correct?

Thanks.
~~~~~~~~~~~~~~~


      *************************
                See my editing.
      *************************


Your set up is correct.

So far, so good.

Next, you need to find the crushing load L from your equation.



RELATED QUESTIONS

A civil engineer relates the thickness T, in inches, and height H, in feet, of a square... (answered by ikleyn)
A civil engineer relates the thickness T, in inches, and height H, in feet, of a square... (answered by ewatrrr)
The crushing load of a square wooden post varies directly as the fourth power of it's... (answered by stanbon)
The safe load LF a wooden beams to put it up both and varies jointly as the wet W in the... (answered by ikleyn,greenestamps)
The formula V=1/3lwh relates the volume of a square pyramid to its base length l, base... (answered by Earlsdon)
The load that can supported by a rectangular beam varies jointly as the width of the beam (answered by onlinepsa,ikleyn)
An object is dropped from the top of a building that is 144 ft high. The function given... (answered by ewatrrr)
A model rocket is shot vertically upward with an initial velocity of 288 ft./sec. The... (answered by Alan3354,ewatrrr)
a bridge take 12 cubic yards of concrete to make it 4 inches thick. I need to write a... (answered by richwmiller)