SOLUTION: A machine comes in 2 parts, which weigh 'x' kg and 'b' kg respectively. The cost 'c' of the machine is given by c = 2x + b. The earning capacity 'y' of the machine is given by y =
Algebra.Com
Question 1012464: A machine comes in 2 parts, which weigh 'x' kg and 'b' kg respectively. The cost 'c' of the machine is given by c = 2x + b. The earning capacity 'y' of the machine is given by y = x(x+b). If 'c' has the fixed value 10, express y as a function of x and hence find the value of x for which y is a maximum. Find the maximum value of y.
Answer by Theo(13342) (Show Source): You can put this solution on YOUR website!
A machine comes in 2 parts, which weigh 'x' kg and 'b' kg respectively. The cost 'c' of the machine is given by c = 2x + b. The earning capacity 'y' of the machine is given by y = x(x+b). If 'c' has the fixed value 10, express y as a function of x and hence find the value of x for which y is a maximum. Find the maximum value of y.
c = cost = 2x + b.
since c = cost = 10, you get 10 = 2x + b.
solve for b to get b = 10 - 2x.
y = x * (x+b)
since b = 10 - 2x, you get y = x * (x + 10 - 2x)
simplify to get y = x * (10 - x)
simplify further to get y = 10x - x^2
set this equation into standard quadratic form of 0 = ax^2 + bx + o get y = -x^2 + 10x.
this means that:
a = -1
b = 10
c = 0
the x value of the max/min point of a quadratic equation is at x = -b/2a.
this becomes x = -10/-2 which results in x = 5.
when x = 5, y = -x^2 + 10x becomes y = -25 + 50 which becomes y = 25.
the maximum earning capacity is therefore 25 units of whatever denomination you are using.
you can graph this equation and it will show you the same result visually.
look below:
RELATED QUESTIONS
A machine comes in 2 sections. The weights of the section are x kg and b kg. The cost, c, (answered by Theo)
. A company has three machines A, B and C which all produce the same two parts, X and Y.... (answered by ikleyn)
A company has three machines A, B and C which all produce the same two parts, X and
Y.... (answered by ikleyn)
A product may be made using Machine I or Machine II. The manufacturer estimates that the... (answered by Theo)
A company has three machines A, B and C which all produce the same two parts, X and
Y.... (answered by ikleyn)
Please help me answer this question.
Half of a set of parts are manufactured by... (answered by stanbon)
Three stones are weighed on a scale, two at a time. The scale shows weights of 49 kg, 63... (answered by Alan3354)
An air force is experimenting with three types of bombs P, Q, and R in which three kinds... (answered by Theo)
In a manufacturing plant, three machines, A, B, and C, produce 40%, 33%, and 27%,... (answered by ewatrrr)