SOLUTION: A production line is designed on the assumption that the difference between mean assembly times for two operations is five minutes. Independent tests for the two assembly operation

Algebra.Com
Question 824539: A production line is designed on the assumption that the difference between mean assembly times for two operations is five minutes. Independent tests for the two assembly operations yielded the following results.
Operation A: n1 = 25, xbar1 = 19.2, s1 = .73.
Operation B: n2 = 25, xbar2 = 13.68, s2 = .53.
At the 2% significant level, test the hypothesis that the difference between the mean assembly times is u1 - u2 = 5 minutes.
The p-value of the test statistic is:

Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!
A production line is designed on the assumption that the difference between mean assembly times for two operations is five minutes. Independent tests for the two assembly operations yielded the following results.
Operation A: n1 = 25, xbar1 = 19.2, s1 = .73.
Operation B: n2 = 25, xbar2 = 13.68, s2 = .53.
At the 2% significant level, test the hypothesis that the difference between the mean assembly times is u1 - u2 = 5 minutes.
----
Ho: u1-u2 = 5
Ha: u1-u2 # 5
-----
Sample stat:: xbar1-xbar2 = 19.2-13.68 = 5.52
test statistic:: z(5.52) = (5.52-5)/sqrt[0.73^2/25 + 0.53^2/25] = 2.8821
----------------
p-value = 2*P(z > 2.8821) = 2*normalcdf(2.8821,100) = 0.0039
-----------------
Conclusion: Since the p-value is less than 2%, reject Ho.
============
Cheers,
Stan H.
==============

RELATED QUESTIONS

The director of training for an electronic equipment manufacturer is interested in... (answered by stanbon)
A production manager is conducting a Z test of her assembly line. She collects a sample... (answered by stanbon)
Three assembly lines are used to produce a certain component for an airliner. To examine... (answered by Theo)
Three assembly lines are used to produce a certain component for an airliner. To examine... (answered by asinus)
A company produces labeled packaging material and the company intends to buy a new... (answered by richwmiller)
A company has a defect rate of 0.3% on its production line. The defect average for last... (answered by Gogonati)
An aircraft strobe light is designed so that the times between flashes are normally... (answered by rothauserc)
Zodwa,the operations manager of a large production plant would like to estimate the mean... (answered by Boreal)
a line that is 20cm long is divided into two parts so that the square on the longer than... (answered by stanbon,MathTherapy)