SOLUTION: An electrical company takes 120 hours with a standard deviation of 25 hours to wire a build complex. What is probability that the same company will take at least 115 hours to do th
Algebra.Com
Question 787888: An electrical company takes 120 hours with a standard deviation of 25 hours to wire a build complex. What is probability that the same company will take at least 115 hours to do the same job?
Answer by stanbon(75887) (Show Source): You can put this solution on YOUR website!
An electrical company takes 120 hours with a standard deviation of 25 hours to wire a build complex. What is probability that the same company will take at least 115 hours to do the same job?
--------
z(115) = (115-120)/25 = -1/5
------
P(x >= 115) = P(z >= -1/5) = 0.5793
=============
Cheers,
Stan H.
=============
RELATED QUESTIONS
A tiling company takes 150 hours with a standard deviation of 21 hours to roof a building (answered by stanbon)
Suppose a truck company takes 31 hours of labor to build a car and the labor time is... (answered by stanbon)
A company that manufactures bookcases finds that the average time it takes an employee to (answered by ewatrrr)
. An electrical firm manufactures light bulbs that have a length of life that is normally (answered by stanbon)
3.An electrical company claims that the average life of the bulbs it manufactures is 1200 (answered by ikleyn)
An electrical company claims that the average life of the bulbs it manufactures is 1200... (answered by CPhill)
"An electrical firm manufactures light bulbs that have a length of life that is... (answered by CPhill)
The lifetime of a Duracell AAA battery is normally distributed with a mean M=28.5 hours... (answered by stanbon)
Batteries for a radio are thought to be normally distributed with a mean life of 160... (answered by Fombitz)