SOLUTION: A production process outputs items in lots of 50. Sampling plans exist in which lots are pulled aside periodically and exposed to a certain type of inspection. It is usually assume
Algebra.Com
Question 730638: A production process outputs items in lots of 50. Sampling plans exist in which lots are pulled aside periodically and exposed to a certain type of inspection. It is usually assumed that the proportion defective is very small. It is important to the company that lots containing defectives be a rare event. The current inspection plan is to periodically sample randomly 10 out of the 50 items in a lot and, if none are defective, to perform no intervention.
(a) Suppose in a lot chosen at random, 2 out of 50 are defective. Calculate the
probability that at least 1 in the sample of 10 from the lot is defective.
(b) Calculate the mean number of defects found out of 10 items sampled.
Answer by stanbon(75887) (Show Source): You can put this solution on YOUR website!
The current inspection plan is to periodically sample randomly 10 out of the 50 items in a lot and, if none are defective, to perform no intervention.
(a) Suppose in a lot chosen at random, 2 out of 50 are defective. Calculate the
probability that at least 1 in the sample of 10 from the lot is defective.
For each item p(defective) = 2/50 ; P(not defective) = 48/50
---
P(at least one defective ) = 1 - P(none are defective)
= 1 - 48C10/50C10 = 0.6367
----------------------
(b) Calculate the mean number of defects found out of 10 items sampled.
mean = np = 10(2/50) = 2/5
===============================
Cheers,
Stan H.
RELATED QUESTIONS
Aproduction process outputs items in lots of 50. Sampling plans exist in which lots are... (answered by Boreal)
Consider the situation of Review Exercise 5.95.
It has been determined that the sampling (answered by ikleyn)
Can someone help me with this problem:
In a certain production process, 25% of the... (answered by rothauserc,ewatrrr)
Suppose that when a production process malfunctions, 50 out of 100 items are defective.... (answered by Theo)
i need lots of tutoring on this! im in algebra 2 and i dont get a thing! plz... (answered by stanbon)
A plot of land is 153 acres. The land is to be partitioned into lots that are 3 acres in (answered by Cromlix)
The quality assurance engineer of a receiving-sets manufacturer inspects receiving-sets... (answered by ikleyn)
The quality assurance engineer of a receiving-sets manufacturer inspects receiving-sets... (answered by Theo,ikleyn)
A realtor bought a group of lots for $90,000. He then sells them at a gain of $3,750 per... (answered by ikleyn)