SOLUTION: The time required for the credit card application process follows a normal distribution with a mean of 10 days and a standard deviation of 4 days. Find the probability that the tim
Algebra.Com
Question 624428: The time required for the credit card application process follows a normal distribution with a mean of 10 days and a standard deviation of 4 days. Find the probability that the time taken to process a particular credit card application
(a) exceeds 13 days
(b) is less than 5 days
Please help me to solve this problem for me.
Answer by Emsley(35) (Show Source): You can put this solution on YOUR website!
Standardised normal variable is z= (13-10)/4=0.75
Look up 0.75 in the normal tables. Then because question says greater than 13 you want 1-(this value)
RELATED QUESTIONS
Suppose the time to process a loan application follows a uniform distribution over the... (answered by ikleyn)
A construction project is at present 30 days away from the scheduled completion date.... (answered by CPhill)
At Ajax Spring Water, a 1/2 liter bottle of soft drink is supposed to contain a mean of... (answered by stanbon)
At Ajax Spring Water, a half-liter bottle of soft drink is supposed to contain a mean of... (answered by stanbon)
At Ajax Spring Water, a half-liter bottle of soft drink is supposed to contain a mean of... (answered by stanbon)
At Ajax Spring Water, a half-liter bottle of soft drink is supposed to contain a mean of... (answered by jim_thompson5910)
At Ajax Spring Watewr, a half-liter bottle of soft dring is supposed to contain a mean of (answered by stanbon)
At Ajax Spring Water, a half-liter bottle of soft drink is supposed to contain
a mean of (answered by stanbon)
Problem 9.52
At Ajax Spring Water, a half-liter bottle of soft drink is supposed to... (answered by stanbon)