Question 432710: Need help with this Problem... Thank You!!
23. At a quality control checkpoint on a manufacturing
assembly line, 10% of the items failed check A, 12%
failed check B, and 3% failed both checks A and B.
a. If a product failed check A, what is the probability
that it also failed check B?
b. If a product failed check B, what is the probability
that it also failed check A?
c. What is the probability that a product failed either
check A or check B?
d. What is the probability that a product failed neither
check A nor check B?
Answer by edjones(8007) (Show Source): You can put this solution on YOUR website!
Make a Venn diagram to understand this problem.
a)3/10
b)3/12=1/4
c).07+.03+.09=.19 A U B
d)1-.19=.81 (A U B)'
.
Ed
RELATED QUESTIONS
Here is my question.
At a quality control checkpoint on a manufacturing assembly line,... (answered by stanbon)
The quality control department of a semiconductor manufacturing company tests every 100th (answered by Boreal)
To estimate the percentage of defects in a recent manufacturing batch, a quality-control... (answered by Theo)
Julio works as a quality control expert in a beverage factory. The assembly line that he... (answered by checkley71)
Can you help me solve this problem?
Julio works as a quality control expert in a... (answered by checkley71)
Can you help me solve this problem?
Julio works as a (answered by fractalier)
An assembly line puts widgets together with a success rate of 95%. ( i.e. 5% of the... (answered by reviewermath)
I need help with this word problem, please help thanks!
A quality control inspector... (answered by ewatrrr)
A company claims that 99% of its cereal boxes have at least as
much cereal by weight as... (answered by stanbon)