SOLUTION: * Items are inspected for flaws by two quality inspectors. If a flaw is present, it will be detected by the first
inspector with probability 0.90, and by the second inspector with
Algebra.Com
Question 363905: * Items are inspected for flaws by two quality inspectors. If a flaw is present, it will be detected by the first
inspector with probability 0.90, and by the second inspector with probability 0.70. Assume the innspectors function independently.
a. If an item has a flaw, what is the probability that it will be found by both inspectors?
b. Assume that the second inspector examines only those items that have been passed by the first inspector. If an item has a flaw, what is the probability that the second inspector will find it?
Answer by SadieKhan(31) (Show Source): You can put this solution on YOUR website!
1)
P( first found flaw and second found flaw) = P(first)*P(second)= 0.9*0.7 = 0.63
2)
p(first didnt find flaw and second found flaw) = (1-0.9)*(o.7) = 0.1*0.7 = 0.07
HTH
SadieKhan
RELATED QUESTIONS
A certain manufactured bag is visually inspected by two different quality control... (answered by Theo)
I need help setting up the formula to solve this word problem:
On a factory assembly... (answered by rothauserc)
An assembly line has two inspectors. The probability that the first inspector will miss... (answered by ikleyn)
A quality control inspector found flaws in 13 out of 150 sweaters.
Here is the... (answered by stanbon)
in a factory, one inspector checks every 8th item coming off the assembly like. another... (answered by jim_thompson5910)
A quality control inspector is always on the lookout for substandard parts and components (answered by Sanakhan6)
A production process produces an item. On average, 15% of all items produced are... (answered by stanbon)
A production process produces an
item. On average, 15% of all items produced are... (answered by Edwin McCravy,math_tutor2020)
A smoke detector system uses two devices A and B. If smoke is present the
probability... (answered by ciaV)