SOLUTION: A manufacturer wants to increase the shelf life of a line of cake mixes. Past records indicate that the average shelf life of the mix is 216 days. After a revised mix has been deve

Algebra.Com
Question 230204: A manufacturer wants to increase the shelf life of a line of cake mixes. Past records indicate that the average shelf life of the mix is 216 days. After a revised mix has been developed, a sample of nine boxes of cake mix gave these shelf lives (in days): 215, 217, 218, 219, 216, 217, 218 and 218, At the 0.025 level, has the shelf live of the cake mix increased?
A. Yes, because computed t is greater than the critical value.
B. Yes, because computed t is lss than the critical value.
C. No, because computed t lies in the region of acceptance.
D. No, because 217.24 is quite close to 216.

Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!
A manufacturer wants to increase the shelf life of a line of cake mixes. Past records indicate that the average shelf life of the mix is 216 days. After a revised mix has been developed, a sample of nine boxes of cake mix gave these shelf lives (in days): 215, 217, 218, 219, 216, 217, 218 and 218, At the 0.025 level, has the shelf live of the cake mix increased?
---
I ran a Ttest on a TI calculator and got the following results:
test statistic: t = 2.7584
p-value = 0.0141
Since the p-value is less that 2.5%, reject Ho.
----------------------------------------------------------
Ans: A
--------------------
Cheers,
Stan H.
A. Yes, because computed t is greater than the critical value.
B. Yes, because computed t is less than the critical value.
C. No, because computed t lies in the region of acceptance.
D. No, because 217.24 is quite close to 216.

RELATED QUESTIONS

a manufacturer wants to increase the shelf life of a line of cake mixes. Past records... (answered by stanbon)
A manufacturer wants to increase the shelf life of a line of cake mixes. Past records... (answered by Boreal)
A baking company claims that the average shelf life for its bread is 7 days. Suppose that (answered by stanbon)
amit wants to build a wooden book shelf measuring 235 in length .what is the length of... (answered by ewatrrr)
I needs to cut four shelves from a board that is 2.5 meters long. The second shelf is 18... (answered by rfer)
Robert needs to cut four shelves from a board that is 2.5 meters long. The second shelf... (answered by Theo)
A handy man is installing a new shelf in his work shop. He wants to cut a 72 inch board... (answered by Earlsdon)
Hi, I need some help with this word problem : John is building a shelf and wants to nail... (answered by addingup)