SOLUTION: The commercial for the new Mad meat Man Barbeque claims that it takes 20 minutes for assembly.
A consumer advocate thinks that the assembly time is higher than 20 minutes.
The ad
Algebra.Com
Question 1183058: The commercial for the new Mad meat Man Barbeque claims that it takes 20 minutes for assembly.
A consumer advocate thinks that the assembly time is higher than 20 minutes.
The advocate surveyed 15 randomly people who purchased the Meat Man Barbeque and found that their average time was 21.3 minutes.
The standard deviation for this survey group was 2.6 minutes.
What can be concluded at the a = 0.10 level of significance?
a) For this study, we should use = t-test for a population mean
b) The null and alternative hypotheses would be:
Ho: u = ________
c) The test statistic t = _______
To 3 decimals
d) The p-value = ______
To 4 decimals
Answer by Theo(13342) (Show Source): You can put this solution on YOUR website!
test mean is 20 minutes.
sample mean is 21.3 minutes with standard deviation of 2.6 minutes.
sample size is 15.
test is whether sample mean is higher than test mean.
this indicates a one tailed confidence interval with the tail on the high end.
null hypothesis is assembly time is 20 minutes.
alternate hypothesis is assembly time is greater than 20 minutes.
standard error = standard deviation / sqrt(sample size) = 2.6/sqrt(15) = .671317 rounded to 6 decimal places.
t-score = (x - m) / s
x is the sample mean
m is the test mean
s is the standard error.
t = (21.3 - 20) / .671317 = 1.936 rounded to 3 decimal places.
degrees of freedom = 15 - 1 = 14.
probability of getting a t-score greater than 1.936492 with 14 degrees of freedom is .0367.
critical p-value at 14 degrees of freedom is .10.
test p-value is lower than this.
test is significant.
the alternate hypothesis that states that the assembly time is greater than 20 minutes is accepted.
test statistic is t(14) = 1.936 rounded to 3 decimal places.
p-value = .0367
here's a t-test calculator that will get your answer for you.
https://www.socscistatistics.com/pvalues/tdistribution.aspx
your inputs for this test are:
t = 1.936
degrees of freedom = 14
test is one tail
critical p-value is .10
note that if the test is > or <, then the the test is one tail and the critical p-value is .10 on only one end, and if the test is two tail, the critical p-value is cut in half = .05 and placed on both ends of the confidence interval.
here are the results from that calculator.

RELATED QUESTIONS
The commercial for the new Meat Man Barbecue claims that it takes 15 minutes for... (answered by ewatrrr)
Estimate how long it takes for a commercial airliner averaging 525 mph to complete the... (answered by ikleyn)
Mr.adams will be serving 20 people at a barbeque. He plans to make two hamburgers for... (answered by stanbon)
Zodwa,the operations manager of a large production plant would like to estimate the mean... (answered by Boreal)
A factory works a two shift system with 50 workers on each shift. The morning shift... (answered by ewatrrr)
A toy company wants to determine the average amount of time it takes an adult to assemble (answered by stanbon)
The management of White Industries is considering a new method of assembling its golf... (answered by stanbon)
Tests of Hypothesis
18) The management of White Industries is considering a new method (answered by Edwin McCravy)
The management of White Industries is considering a new method of assembling it's golf... (answered by stanbon)