SOLUTION: (Give your answers correct to TWO (2) decimal places) In a time and motion study, the amount of time required to paint a 10-foot by 10-foot room is measured for 25 painters. The

Algebra.Com
Question 1175516: (Give your answers correct to TWO (2) decimal places)
In a time and motion study, the amount of time required to paint a 10-foot by 10-foot room is measured for 25 painters. The sample mean is calculated and found to be 72 minutes. If we assume that the population standard deviation is 5 minutes,
(a) find the 95% confidence interval estimate of the mean time for all painters to paint a 10-foot by 10-foot room.
Answer:the 95% confidence interval estimate of the mean time for all painters to paint a 10-foot by 10-foot room is from ____ minutes to ____minutes.

(b) find the 97% confidence interval estimate of the mean time for all painters to paint a 10-foot by 10-foot room.
Answer: the 97% confidence interval estimate of the mean time for all painters to paint a 10-foot by 10-foot room is from____ minutes to____minutes.

Answer by Theo(13342)   (Show Source): You can put this solution on YOUR website!
sample size is 25
sample mean is 72 minutes
population standard deviation is 5 minutes.

standard error = standard deviation / square root of sample size = 5 / sqrt(25) = 5/5 = 1.

z-score = (x - m) / s

x is the raw score
m is the raw mean
s is the standard error.

at two tailed confidence level, the tails on each end of the confidence interval are 2.5%.

the critical z-score is therefore equal to plus or minus 1.96.

solve for the high raw score as follows:

start with 1.96 = (x - 72) / 1

solve for x to get x = 1.96 * 1 + 72 = 73.96.

solve for the low raw score as follows:

start with -1.96 = (x - 72) / 1

solve for x to get x = -1.96 * 1 + 72 = 70.04

your answer for question (a) is 70.04 to 73.96 minutes.

with a two tailed 97% confidence level, the tails on each end of the confidence interval are 1.5%.

the critical z-score becomes plus or minus 2.17.

solve for the low and high raw score in the same manner as you did the the 95% confidence interval.

you will get the low score equal to 69.83 and the high score equal to 74.17.

visually, this looks like this.

first 95% confidence interval, then 97% confidence interval.





when dealing with the mean of a sample, you do not use the standard deviation.

you use the standard error.

the standard error is defined as the standard deviation of the distribution of sample means.

here's a reference.

https://www.investopedia.com/terms/s/standard-error.asp














RELATED QUESTIONS

Just here to check my answers if am I correct. Its gonna be a long question anyway If Im (answered by josgarithmetic,MathTherapy)
Use Table 10 of Appendix B to find the 95% interval for r when a sample of n = 25 results (answered by Alan3354)
A culture of cells is growing exponentially. The number of cells at 8 A.M. is 25 and the... (answered by richwmiller)
Consumer Reports rated airlines and found that 82% of the flights involved in the study... (answered by ewatrrr)
Consumer Reports rated airlines and found that 87% of the flights involved in the study... (answered by stanbon)
The Bureau of Labor Statistics’ American Time Use Survey showed that the amount of time... (answered by ewatrrr)
The amount of time required to assemble a component on a factory assembly line is... (answered by Boreal)
The funds dispensed at the ATM machine located near the checkout line at the Kroger's in... (answered by ewatrrr)
John and Terry are painting a house together. When working alone John can paint the house (answered by Cromlix)