SOLUTION: The Quality Control Department employs five technicians during the day shift. Listed below is the number of times each technician instructed the production foreman to shut down the

Algebra.Com
Question 1165218: The Quality Control Department employs five technicians during the day shift. Listed below is the number of times each technician instructed the production foreman to shut down the manufacturing process last week.

Technician Shutdowns
Taylor 3
Hurley 1
Gupta 3
Rousche 3
Huang 1

How many different samples of two technicians are possible from this population?




List all possible samples of two observations each and compute the mean of each sample. (Round your answers to 2 decimal places.)




Compare the mean of the sample means with the population mean. (Round your answers to 2 decimal places.)




Answer by CPhill(2138)   (Show Source): You can put this solution on YOUR website!
This problem involves concepts from combinatorics and sampling distributions.
The population is the set of five technicians with their corresponding number of shutdowns: $\{3, 1, 3, 3, 1\}$.
The population size is $N=5$.
The sample size is $n=2$.
## 1. How many different samples of two technicians are possible?
Since the order of selection does not matter (a sample of Taylor and Hurley is the same as Hurley and Taylor) and sampling is without replacement, we use the combination formula:
$$\text{Number of Samples} = \binom{N}{n} = \binom{5}{2} = \frac{5!}{2!(5-2)!} = \frac{5 \times 4}{2 \times 1} = 10$$
**There are 10 different samples of two technicians possible.**
---
## 2. List all possible samples and compute the mean of each sample.
Let the technicians be represented by the first letter of their names: T, H, G, R, U.
The shutdown values are: $T=3, H=1, G=3, R=3, U=1$.
| Sample (Technicians) | Shutdown Values | Sample Mean ($\bar{x}$) |
| :---: | :---: | :---: |
| T, H | $\{3, 1\}$ | $(3+1)/2 = 2.00$ |
| T, G | $\{3, 3\}$ | $(3+3)/2 = 3.00$ |
| T, R | $\{3, 3\}$ | $(3+3)/2 = 3.00$ |
| T, U | $\{3, 1\}$ | $(3+1)/2 = 2.00$ |
| H, G | $\{1, 3\}$ | $(1+3)/2 = 2.00$ |
| H, R | $\{1, 3\}$ | $(1+3)/2 = 2.00$ |
| H, U | $\{1, 1\}$ | $(1+1)/2 = 1.00$ |
| G, R | $\{3, 3\}$ | $(3+3)/2 = 3.00$ |
| G, U | $\{3, 1\}$ | $(3+1)/2 = 2.00$ |
| R, U | $\{3, 1\}$ | $(3+1)/2 = 2.00$ |
---
## 3. Compare the mean of the sample means with the population mean.
### A. Calculate the Population Mean ($\mu$)
The population consists of all 5 shutdown values: $\{3, 1, 3, 3, 1\}$.
$$\mu = \frac{\sum x}{N} = \frac{3 + 1 + 3 + 3 + 1}{5} = \frac{11}{5}$$
$$\mathbf{\mu = 2.20}$$
### B. Calculate the Mean of the Sample Means ($\mu_{\bar{x}}$)
The mean of the sample means is the sum of the 10 sample means divided by the number of samples (10).
$$\mu_{\bar{x}} = \frac{\sum \bar{x}}{10}$$
$$\mu_{\bar{x}} = \frac{2.00 + 3.00 + 3.00 + 2.00 + 2.00 + 2.00 + 1.00 + 3.00 + 2.00 + 2.00}{10}$$
$$\mu_{\bar{x}} = \frac{22.00}{10}$$
$$\mathbf{\mu_{\bar{x}} = 2.20}$$
### C. Comparison
The mean of the sample means ($\mu_{\bar{x}}$) is **equal** to the population mean ($\mu$).
$$\mu_{\bar{x}} = 2.20$$
$$\mu = 2.20$$
This demonstrates a key principle of sampling distributions: the mean of the sampling distribution of the sample mean ($\mu_{\bar{x}}$) is always equal to the population mean ($\mu$).

RELATED QUESTIONS

A production facility employs 20 workers on the day shift, 15 workers on the swing shift, (answered by stanbon)
During a certain shift, a quality control inspector inspected 6 out of every 30 items... (answered by ikleyn)
A warehouse employs 27 workers on first shift, 19 workers on second shift, and 14 workers (answered by ikleyn)
The quality control department in a clothing factory found an average of two rejects per... (answered by KMST)
A company operates four machines during three shifts each day. From production records,... (answered by stanbon)
A company operates four machines during three shifts each day. From production records,... (answered by stanbon)
Quality Associates, Inc., a consulting firm, advises its clients about sampling and... (answered by onyulee)
During an average day, the number of patients that seek help in an emergency room is 16.... (answered by richard1234)
3. In a quality control unit of a newspaper printing, a newspaper is selected randomly... (answered by ikleyn)