SOLUTION: b) A civil engineer monitors water quality by measuring the amount of suspended solids in a sample of river water over 11 weeks the following observations were recorded 14,12,21,28

Algebra.Com
Question 1162126: b) A civil engineer monitors water quality by measuring the amount of suspended solids in a sample of river water over 11 weeks the following observations were recorded 14,12,21,28, 30, 63,29, 63, 55, 19, 20
Suspended solids (parts per million)
(i) Find the quartiles
(ii) Find the minimum, maximum, range and interquartile range,
(iii) Construct a box plot

Answer by ikleyn(52864)   (Show Source): You can put this solution on YOUR website!
.

Why the tutors should do your job ?


Or,  in other terms,  WHY  DO  YOU  THINK  the tutors should do your job ?



RELATED QUESTIONS

A civil engineer monitors water quality by measuring the amount of suspended solids in a (answered by mathmate)
A civil engineer monitors water quality by measuring the amount of suspended solids in (answered by mathmate)
A civil engineer monitors water quality by measuring the amount of suspended solids in a (answered by mathmate)
The water quality is acceptable if the mean amount of suspended solids is less than 49.... (answered by stanbon)
The water quality is acceptable if the mean amount of suspended solids is less than 49.... (answered by stanbon)
Please help me to solve this problem. A certain paint mixture weighing 305 kg contains (answered by Boreal,ikleyn)
A certain paint mixture weighing 320 kg contains 17% solids suspended in water. How many... (answered by josgarithmetic)
The pH of a water sample is one of the many measurements of water quality done by the... (answered by scott8148)
A tank measuring 12 cm by 16cm by 24cm is 2/3 filled with water. 1/2 the amount of water... (answered by greenestamps)