SOLUTION: In the laboratory analysis of samples from a chemical process, five samples from the process are analyzed daily. In addition, a control sample is analyzed two times each day to

Algebra.Com
Question 1152123: In the laboratory analysis of samples from a chemical
process, five samples from the process are analyzed daily. In
addition, a control sample is analyzed two times each day to
check the calibration of the laboratory instruments.
(a) How many different sequences of process and control
samples are possible each day? Assume that the five
process samples are considered identical and that the two
control samples are considered identical.
(b) How many different sequences of process and control
samples are possible if we consider the five process samples
to be different and the two control samples to be identical?
(c) For the same situation as part (b), how many sequences
are possible if the first test of each day must be a control
sample?
a.
b.
c. ... It is said to be 6!. But, how's that possible? I need clarification for this

Answer by math_helper(2461)   (Show Source): You can put this solution on YOUR website!
Regarding part (c), because the control samples are considered identical, and the first sample must be a control, that leaves one control and 5 distinct process samples, resulting in 6! possible arrangements.


{CC} = control
{DEFGH} = process
C { DEFGHC }
^^^^^^
6! ways to arrange these
RELATED QUESTIONS

Three samples are taken simultaneously from a process that is know to produce 20%... (answered by stanbon)
On the colorimetric analysis to detect the presence of nitrates in the water of the... (answered by Glaviolette)
The Lualailua Hills Quadrangle of the East Maui (Haleakala) volcano on the island of... (answered by Boreal,ikleyn)
A particular chemical analysis has a rather limited range. Typically, 15% of the... (answered by mark_henrhiz)
The percent defective for parts produced by a manufacturing process is targeted at 4%.... (answered by Boreal)
What are the various steps involved in the process of data analysis carried out for... (answered by ikleyn,Alan3354)
Rejection of the null hypothesis in the two-sample case implies that a. the samples... (answered by stanbon)
Let the specified dimension and standard deviation for a process be 330 and .5... (answered by Fombitz)
What is meant by the term 90% confident when constructing a confidence interval for a... (answered by ewatrrr)