SOLUTION: The following are the numbers of mistakes made in 4 successive days for 4 technicians working for a photographic laboratory: tI t2 t3 t4 5 13 9 8 13 8 11 11 9 11 6

Algebra.Com
Question 1011561: The following are the numbers of mistakes made in 4
successive days for 4 technicians working for a
photographic laboratory:
tI t2 t3 t4
5 13 9 8
13 8 11 11
9 11 6 7
10 13 10 10
Test at the level of significance α = 0.0.5 whether the
differences among the 4 samples means can be
attributed to chance

Answer by Boreal(15235)   (Show Source): You can put this solution on YOUR website!
SS df MS F p
Between::14.250 3 4.750 1.422 0.285
Within: 40.098 12 3.342
Total: 54.348 15
This was done with the E(x^2)-(E(x))^2
This makes intuitive sense. The difference in the means is not great, and with only 4 samples the likelihood of a significant difference would a priori be low.

RELATED QUESTIONS

The following are the numbers of mistakes made in 4 successive days for 4 technicians... (answered by ikleyn)
The following are the numbers of mistakes made in 4 successive days for 4 technicians... (answered by ikleyn)
I need the formula for the following: I have 39 technicians working 8 hours a day. The... (answered by ankor@dixie-net.com)
20 men can do a piece of work in 24 days. After working for few days,4 men are added and... (answered by fractalier)
A student is asked to solve b^2+b^2=c^2 for a and gives the following solution. Assume... (answered by Alan3354,Edwin McCravy)
Hey! I am confused on how to solve this problem in which I have to solve by using... (answered by MathLover1)
If 5 technicians can produce 64 surfboards in 4 days, how many surfboards can 8... (answered by stanbon)
1. 20 men can do a piece of work in 30 days.After working for how many days should 5 men... (answered by josgarithmetic)
16 workers can complete a piece of work in 30 days.After working for 10 days, 4 more... (answered by richwmiller,ikleyn)