SOLUTION: Computer encoder A can finish a job in as many days as encoder B. Encoder C can finish the same job in 2 days less time than encoder B. Together, the three encoders worked for 2 da
Algebra.Com
Question 909187: Computer encoder A can finish a job in as many days as encoder B. Encoder C can finish the same job in 2 days less time than encoder B. Together, the three encoders worked for 2 days; after which, encoder A and B got sick and were forced to stop working leaving encoder C alone to finish the job in three more days. Find the rate of each encoder.
Answer by Theo(13342) (Show Source): You can put this solution on YOUR website!
rate * time = quantity.
quantity = 1 job
let x = number of days A can do the job alone.
let x = number of days B can do the job alone.
let (x-2) = number of days C can do the job alone.
the rate for A is 1/x of the job in one day.
the rate for B is 1/x of the job in one day.
the rate for C is 1/(x-2) of the job in one day.
this is determined by taking the equation of rate * time = quantity and solving for rate to get rate = quantity / time.
all 3 work for 2 days.
the formula for that is:
(1/x + 1/x + 1/(x-2) * 2 = part 1 of the job.
C finishes the rest of the job in 3 days.
the formula for that is:
(1/(x-2) * 3 = part 2 of the job.
simplify these equations to get:
2/x + 2/x + 2/(x-2) = part 1 of the job.
3/(x-2) = part 2 of the job.
since part 1 and part 2 of the job equals the whole job, you get:
2/x + 2/x + 2/(x-2) + 3/(x-2) = 1
multiply both sides of this equation by x * (x-2) to get:
2 * (x-2) + 2 * (x-2) + 2 * x + 3 * x = x * (x-2)
simplify this to get:
2x - 4 + 2x - 4 + 2x + 3x = x^2 - 2x
combine like terms to get:
9x - 8 = x^2 - 2x
subtract 9x from, and add 8x to, both sides of this equation to get:
0 = x^2 - 2x - 9x + 8
combine like terms to get:
0 = x^2 - 11x + 8
factor x^2 - 11x + 8 using the quadratic formula to get:
x = 10.21699057 or x = .783009434
x can't be .783009434 because x - 2 would then be negative and that isn't possible.
your solution must be x = 10.21699057 or not at all.
when x = 10.21699057, your rates becomes:
rate of A = 1/x = .0978761792
rate of B = 1/x = .0978761792
rate of C - 1/(x-2) = .1216990566
using these values, your equation of:
2/x + 2/x + 2/(x-1) + 3/(x-1) = 1 becomes:
2 * rate of A plus 2 * rate of B plus 2 * rate of C plus 3 * rate of C = 1
replace rate of A with .0978761792 and replace rate of B with .0978761792 and replace rate of C with .1216990566 and you get:
2 * .0978761792 + 2 * .0978761792 + 2 * .1216990566 + 3 * .1216990566 which can be simplified to:
4 * .0978761792 + 5 * .1216990566 = 1 which can be finally simplified to:
1 = 1
this confirms the solution is good.
RELATED QUESTIONS
A computer encoder A can finish a job in as many days as encoder B. Encoder C can finish... (answered by richwmiller)
ABC can finish the job in 2 days altogether. A can finish it alone in 5 days. B can... (answered by ewatrrr)
A can finish a certain job in 12 days . A&B can finish same job in 8 days.how many day... (answered by nerdybill)
Danny can finish a job in 10 days. Together, Miguel and Danny can finish the same job in... (answered by rothauserc,ikleyn)
A and B working together can finish the job in 10 days. if A works 4 days and B works 3... (answered by josgarithmetic,ikleyn)
Joshua can finish a certain job in 4 days while Kevin can finish the same job in 2 days.... (answered by stanbon)
A and B together can finish a job in 36 days. If A can do as much
work in 4 days as B... (answered by Edwin McCravy)
A,B and C can finish a job in 6 days. If B and C work together, the job will take 9 days; (answered by stanbon,harshachittar)
It takes worker A six days longer as it takes worker B to finish a certain job. Working... (answered by greenestamps,ikleyn)