SOLUTION: janet can shovel snow in 55 mins. Tom can shovel snow in 40 mins. How long would it take them to shovel snow if they worked together?
Algebra.Com
Question 560216: janet can shovel snow in 55 mins. Tom can shovel snow in 40 mins. How long would it take them to shovel snow if they worked together?
Answer by stanbon(75887) (Show Source): You can put this solution on YOUR website!
janet can shovel snow in 55 mins. Tom can shovel snow in 40 mins. How long would it take them to shovel snow if they worked together?
-----
Janet rate = 1/55 job/min
------
Tom rate = 1/40 job/min
------
Together rate = 1/x job/min
==================================
Equation:
rate + rate = together rate
1/55 + 1/40 = 1/x
---
40x + 55x = 40*55
-----
95x = 40*55
----
x = (11/19)40
---
x = 23.1579 minutes
--
x = 23 min 9.47 seconds
===========================
Cheers,
Stan H.
================
RELATED QUESTIONS
Janet can shovel snow in her driveway in 65 minutes, Tom can do the same job in 45 mins.... (answered by nerdybill)
Lisa can shovel snow from her driveway in 35 minutes. Tom can do the same job in 55... (answered by nerdybill)
Hector can shovel snow off the sidewalk in three hours. Oliver can shovel off the same... (answered by checkley79)
janet can shovel snow from her driveway in 30 minutes. Bill can do the same job in 40... (answered by stanbon)
Janet can shovel snow from her driveway in 45 minutes. Bill can do the same job in 35... (answered by stanbon)
Janet can shovel snow freom her driveway in 50 minutes. Bill can do the same job in 45... (answered by mananth)
Janet can shovel snow from her driveway in 65 minutes. Tom can do the same job in 50... (answered by mananth)
Maria can shovel snow from her driveway in 65 minutes. Tom can do the same job in 45... (answered by scott8148,oberobic)