Question 418040: I can't seem to figure this one out. It's a combination question I think. Here is the question, "A costruction supervisor needs a crew of 14 to do a job, and 15 people voluteered. How many 4- person crews can be chosen?" I hope you can help. Thank you
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
If he has 15, he can make 3 crews of 4 each with 3 left over.
You sure that's the problem?
RELATED QUESTIONS
Hey,
I need help with this question. I can't seem to figure it. Are you able to help... (answered by josgarithmetic)
Hey,
I can't seem to figure the answer to this question, I've tried but doesn't seem... (answered by Alan3354)
good evening,
I am not sure if this is where I need to ask the question on solving... (answered by ankor@dixie-net.com)
This question has to do with "To multiply polynomials that have special products" it... (answered by Alan3354)
my question is this:
v=(50t)/(t+5), solve of t.
i can not seem to figure it out, my (answered by josmiceli)
Hi there,
I am confronted with the following question:
"A job takes 4 hrs for two... (answered by Earlsdon)
I think my vehicles speedometer is not reading correctly and I am terrible with math.... (answered by Fombitz)
This is the final question I have left and I just can't seem to figure it out.
Here it... (answered by ankor@dixie-net.com)