SOLUTION: A job can be done by 25 men in 32 days. After 8 days, 5 men left. how long will it take the remaining men to finish the job?

Algebra.Com
Question 885169: A job can be done by 25 men in 32 days. After 8 days, 5 men left. how long will it take the remaining men to finish the job?
Found 3 solutions by AnlytcPhil, richwmiller, MathTherapy:
Answer by AnlytcPhil(1806)   (Show Source): You can put this solution on YOUR website!
A job can be done by 25 men in 32 days. After 8 days, 5 men left. how long will it take the remaining men to finish the job?
1 job can be done by 25 men in 32 days.

So when they had worked 8 days, they had done th of the job, since 8 is
th of 32.

So that left  of the job for the 20 to do.

Also since a job can be done by 25 men in 32 days,

then 1 man would take 25 times as long or 800 days.

So each man's work rate is  or


20 men's work rate is 20 times the work rate of one man or 20 times
 or  which reduces to  

Suppose it took them N days to finish the job. Then 

 



Multiply both sides by 40

10N = 30
  N = 3

It would take them 3 days.

Edwin


Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
25*32=800
it takes 800 man days to finish the job
8*25=200
in 8 days they used 200 man days
800-200=600
so they need 600 more man days to finish the job.
600/20=30 more days to finish the job
checking out reasonableness.
if the 25 continued they would take 24 more days so it is reasonable that it would take 20 men 30 days to finish

Answer by MathTherapy(10552)   (Show Source): You can put this solution on YOUR website!

A job can be done by 25 men in 32 days. After 8 days, 5 men left. how long will it take the remaining men to finish the job?

It'll take the remaining 20 men, days to complete the remaining of the job
You can do the check!!
If you need a complete and detailed solution, let me know!!
Send comments, “thank-yous,” and inquiries to “D” at MathMadEzy@aol.com.
Further help is available, online or in-person, for a fee, obviously.
For FREE info and answers to questions about the ASVAB exam, the NYS 3 – 8 city/state wide exams,GENERAL
MATH and HOMEWORK QUESTIONS, or MATH QUESTIONS related to the Regents Integrated Algebra,
Regents Geometry, Regents Algebra 2/Trigonometry, SHSAT, COOP/HSPT/TACHS, PSAT, SAT, ACT, SSAT/ISEE,
GRE, CLEP, and the TASC/GED, you can visit: http://asvabstudyzone.freeforums.net/.
RELATED QUESTIONS

A job can be done by 25 men in 32 days. After 10 days 3 men left. How long will it take... (answered by josgarithmetic)
A Certain Job Can Be Done By 8 Men In 20 Days. After 5 Days, 3 Men Left The Job. How... (answered by Theo,Fombitz)
A piece of work can be done by 5 men in 10 days. After 4 days, 3 men were transferred to... (answered by 12217B)
a piece of work can be done by 40 men in 48 days. after 15 days, 18 men were transferred... (answered by stanbon)
a piece of work can be done by 40 men in 48 days, after 15days, 18 men were transferred... (answered by ankor@dixie-net.com)
Twelve men can finish a job in 16 days. Five men were working at the start, after 8 days... (answered by ankor@dixie-net.com,josgarithmetic)
twelve men can finish the job in 20 days. Five men were working at the start and after 10 (answered by lwsshak3)
10 men can complete a job in 14 days. How long will it take 4 men to finish the same job... (answered by josgarithmetic)
A certain job can be done by 72 men in 100 days. There were 80 men at the start of the... (answered by ikleyn,greenestamps,josgarithmetic,math_tutor2020,Edwin McCravy)