SOLUTION: A 3:4:1 concrete mix means that for every 2 parts of sand, 3 parts of gravel, and 1 part of cement. How much sand and cement should be used in the mix compound of 27 cubic feet of

Algebra.Com
RELATED QUESTIONS

A 2:3 concrete mix means that for every two parts of sand , three parts of gravel are... (answered by stanbon)
A concrete mix is in volume proportions of 1 part cement, 2 parts water, 2 parts... (answered by HyperBrain)
A concrete mix is in volume proportions of 1 part cement, 2 parts water, 2 parts... (answered by edjones)
The directions on a bag of cement are to mix 1 part cement, 2 parts sand, and 3 part... (answered by richwmiller,ptaylor)
An amount of cement, sand, and gravel, mixed in the ratio 1-2-4 (1 part cement, 2 parts... (answered by ikleyn)
a concrete mix requires 2 parts sand and three parts cement. How manypds are need for 75... (answered by dabanfield)
Hi a type of concrete is made of 7 parts sand,3 parts cement and 1 part lime.a batch of... (answered by Cromlix)
A concrete mixture is made by mixing cement, sand and gravel, by volume, in the ratio... (answered by Cromlix)
A concrete walkway has the following specifications: 4' wide. 1/3' thick. 3000'... (answered by ikleyn,greenestamps)