SOLUTION: A crew of 2 could put siding on a house in 30 hours. Another crew of 3 could do the same job in 24 hours. How long would it take all 5 people working together?

Algebra.Com
Question 1157207: A crew of 2 could put siding on a house in 30 hours. Another crew of 3 could do the same job in 24 hours. How long would it take all 5 people working together?
Found 2 solutions by josmiceli, greenestamps:
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
The rate of working for the crew of 2 is:
[ 1 siding job ] / [ 30 hrs ]
The rate of working for the crew of 3 is:
[ 1 siding job ] / [ 24 hrs ]
Add their rates to get rate working together
Let = time in hrs for both crews to
do the job
------------------------

multiply both sides by




All 5 working together take 13 hrs 20 min
------------------------------



OK

Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!


Here is alternative to the standard algebraic solution method shown by the other tutor.

Consider the least common multiple of the two given times: the LCM of 24 and 30 is 120.

In 120 hours, the crew of 2 could put siding on 120/30 = 4 houses; the crew of 3 could put siding on 120/24 = 5 houses. So in 120 hours the two crews together could put siding on 4+5=9 houses.

So the number of hours it would take the two crews together to put siding on 1 house is 120/9 = 40/3, or 13 1/3 hours, or 13 hours 20 minutes.


RELATED QUESTIONS

A 3-men crew can do a certain job in 3 weeks and 2 days, if we are to hire 4 men crew... (answered by josmiceli)
in checking records finds that crew A can pave a contract length of highway in 8 hours.... (answered by scott8148)
A roofing crew can roof a house in 10 hours. If a second crew was added, the job would... (answered by CharlesG2)
A three-person maintenance crew could clean a certain building in 4 h, whereas a... (answered by solver91311)
If a crew of 3 people take 2 ½ hours to clean a house, then how long should a crew of 2... (answered by stanbon)
One roofing crew of 5 can finish A 3,800-foot roof in 15 hours, ans another crew of 6 can (answered by richwmiller)
A three-person maintenance crew could clean a certain building in 4h,whereas a... (answered by richwmiller)
Could you please help with this one? Cost of Painting my House: "If we work with our... (answered by stanbon)
A contractor finds that Crew A takes 5(1/2) hours to construct a retaining wall and Crew (answered by ankor@dixie-net.com)