SOLUTION: 40 men can complete a piece of work in 40 days.They started the work together. But at the end of each 10th day, 5 men left the job. The work would have been completed in how many d

Algebra.Com
Question 1053831: 40 men can complete a piece of work in 40 days.They started the work together. But at the end of each 10th day, 5 men left the job. The work would have been completed in how many days ?
Answer by josgarithmetic(39618)   (Show Source): You can put this solution on YOUR website!
RT=J relates constant work rate, time, and quantity of jobs. Your example refers mostly to 1 job. If r is one-man work rate and there are n men working on the same job, the rate of this group is .

Look at how much of the job is done every 10 days...

Basic plan for work was from which .

Now check each ten-day increment of work done.
-


-



-


-



-
What is the sum up to these end of 40 days?


Keep going...
-


-



-


-



-
What is the total sum of the job up to these 80 days?



THIS IS ALL OF THE 80 DAYS.

RELATED QUESTIONS

40 men can complete a work in 40 days. they started the work together. but at the end of... (answered by josgarithmetic)
40 men can complete a work in 40 days. They started the work together But at the end of... (answered by fractalier)
if 15 men can do a work in 210 days . they started working but at the end 10 days 15... (answered by josgarithmetic)
Twelve men can complete a work in 8 days. Three days after they started the work, 3 more... (answered by Edwin McCravy)
10 men working 5 hrs per day can complete a pice of work in 12 days. How many men will be (answered by ankor@dixie-net.com)
A block industry estimates that 10 men must work for 8 hours each day to complete a job... (answered by ankor@dixie-net.com)
A cement factory estimates that 10 men must work for 8 hours each day to complete a job... (answered by josgarithmetic)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
A can do a piece of work in 60 days, which B can do in 40 days. Both started the work but (answered by ikleyn)