SOLUTION: If 8 men can chop 9 cords of wood in 6.5 hours, how long will it take 4 men to chop 3 cords, assuming that all men work at the same rate?

Algebra.Com
Question 430733: If 8 men can chop 9 cords of wood in 6.5 hours, how long will it take 4 men to chop 3 cords, assuming that all men work at the same rate?
Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
If 8 men can chop 9 cords of wood in 6.5 hours, how long will it take 4 men to
chop 3 cords, assuming that all men work at the same rate?
:
Find how many man-hrs required to chop 1 cord of wood.
= 5.778 man-hrs/cord
:
let d = time required by 4 men to chop 3 cords
:
4d = 3(5.778)
4d = 17.333
d =
d = 4.33 days for 4 men to chop 3 cords

RELATED QUESTIONS

Confusion with basic division and multiplication. If 8 men can chop 9 cords of wood in (answered by macston,josgarithmetic)
10. Two men chop one ton of wood in two hours. How long will it take three men to chop... (answered by Theo)
It takes 5 men to paint 2 identical houses in 3 days. Assuming that all men work at the... (answered by stanbon)
IF 10 MEN CAN CUT A PIECE OF WOOD IN 4 DAYS,HOW LONG WILL IT TAKE 8 MEN TO CUT THE SAME... (answered by ramkikk66)
if 5 men can build a house in 16 days how long will it take just 2 men to build the same... (answered by ankor@dixie-net.com)
if it takes 4 men to build a shed in 9 hours, how long will it take 6... (answered by Cromlix)
if 4 men can finish a work in 5 days, how long will it take 8 men to do the same... (answered by ewatrrr)
It takes Edward 8 minutes to chop a pound of garlic and it takes Bella 5 minutes to do... (answered by josmiceli)
if 3 men can paint 4 rooms in 9 hours how many hours and minutes will it take for one man (answered by robertb)