SOLUTION: A company produces three products; P1, P2, and P3 from two raw materials A and B, and Labor L. One unit of product P1 requires 1 unit of A, 3 unit of B and 2 units of L. One unit o

Algebra.Com
Question 1198742: A company produces three products; P1, P2, and P3 from two raw materials A and B, and Labor L. One unit of product P1 requires 1 unit of A, 3 unit of B and 2 units of L. One unit of product P2 requires 2 units of A and B each, and 3 units of L, while one units of P3 needs 2 units of A, 6 units of B and 4 units of L. The company has a daily availability of 8 units of A, 12 units of B and 12 units of L. It is further known that the unit contribution margin for the products is birr 3, 2, and 5 respectively for p1, p2, and p3.

Answer by ikleyn(52781)   (Show Source): You can put this solution on YOUR website!
.
A company produces three products; P1, P2, and P3 from two raw materials A and B, and Labor L.
One unit of product P1 requires 1 unit of A, 3 unit of B and 2 units of L.
One unit of product P2 requires 2 units of A and B each, and 3 units of L,
while one units of P3 needs 2 units of A, 6 units of B and 4 units of L.
The company has a daily availability of 8 units of A, 12 units of B and 12 units of L.
It is further known that the unit contribution margin for the products is
birr 3, 2, and 5 respectively for p1, p2, and p3.
~~~~~~~~~~~~~~~~


Usually, Math problems, when posed in a right way, go with a question,

but I do not see any question in your post, although I strain my eyes as much as I can.


My hypothesis is that some part of the problem is missed in your post.



RELATED QUESTIONS

A Nigeria manufacturing company produces three products,A,B and C.Each product is made... (answered by richwmiller)
A firm produces three products P, Q and R using two raw materials A, B and labor L. The... (answered by greenestamps)
segment p1 p2 has length L and endpoints p1=(2,7)and p2=(8,3). find a point on p1 p2... (answered by stanbon)
Find the point of the line passing through P1(3,5) and P2(-2,-4) and which is (answered by Alan3354)
Three pipes P1,P2,P3 fill a tank in 6 houres.If we closed P3, both pipes P1 AND P2 will... (answered by josmiceli)
Given two rectangles, one with length = l and width = w, and the second rectangle with... (answered by MathLover1)
An arithmetic progression P consists of n terms. From the progression three different... (answered by KMST)
2. Suppose that a company produces two products X and Y. For each unit of each product... (answered by ikleyn)
A company produces two products, A and B. The sales volume for A is at least 80% of the... (answered by ikleyn)