SOLUTION: A contractor builds two types of homes. The first type requires one lot, $12,000 capital, and 150 labordays to build and is sold for a profit of $2400. The second type requires one

Algebra.Com
Question 1159426: A contractor builds two types of homes. The first type requires one lot, $12,000 capital, and 150 labordays to build and is sold for a profit of $2400. The second type requires one lot, $32,000 capital, and 200 labor-days to build and is sold for a profit of $3400. The contractor owns 150 lots and has available for the job $2,880,000 capital and 24,000 labor-days. How many homes of each type will realize the greatest profit?
must be solved using the gauss Jordan method

Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!


???

The Gauss-Jordan method is a method for solving systems of equations.

As far as I can see, it has no application in a problem like this....


RELATED QUESTIONS

I need help learning how to start and finish these three problems. My linear programming (answered by solver91311)
a contractor builds homes of 9 different models and presently has 3 lots to build on. In... (answered by jim_thompson5910)
Q1) Suppose a manufacturer of printed circuits has a stock of 200 resistors,120... (answered by Fombitz)
A small company builds two types of garden chairs. Type A requires 2 hours of machine... (answered by ikleyn)
I am going to ask four questions. My questions are on the counting method, I have a test... (answered by stanbon)
Hi I know how to solve systems of equations, but I'm having trouble setting this one up.... (answered by stanbon)
A contractor builds in two basic models: the Atlantic and the pacific. each Atlantic... (answered by Theo)
Sunrise Homes would like to build high rise apartment buildings in Wilmington, NC. The... (answered by ikleyn)
This is really hard for me :( This Company manufactures three types of dweezle, type... (answered by ankor@dixie-net.com)