Plant A defective panels + Plant B defective panels = 0.03*Defective panels
0.02*16000 + 0.05*b = 0.03*(16000+b) (counting defective panels) ====>
320 + 0.05b = 0.03*16000 + 0.03*b
320 + 0.05b = 480 + 0.03*b
0.05b - 0.03b = 480 - 320 = 160
0.02b = 160 ====> b = = = 8000.
Answer. Plant B produces 8000 panels.
Check. 0.02*16000 + 0.05*8000 = 720; 0.03*(16000+8000) = 720. ! Correct !