SOLUTION: How much work is done when a moving 200 kg horse changes speed from 2 m/s to 4 m/s?

Algebra.Com
Question 1198897: How much work is done when a moving 200 kg horse changes speed from 2 m/s to 4 m/s?
Answer by ikleyn(52798)   (Show Source): You can put this solution on YOUR website!
.

Find the difference of kinetic energies from the end to the beginning.



RELATED QUESTIONS

How much work is done when a 1000 kg car moving at 5 m/s slows to a... (answered by ikleyn)
An object of mass 10 kg is moving at a speed of 9 m/s. How much work must be done on this (answered by Fombitz)
How much centripetal force is needed to keep a 0.2 kg ball on a 1.50 m long string moving (answered by ikleyn)
How much centripetal force is needed to keep a 0.38 kg ball on a 1.55 m string moving in... (answered by addingup,MathLover1)
A heavy, 94-kg crate is pushed a distance of 5.2 m at a speed of 0.40 m/s on the floor of (answered by richard1234)
A plant falls from a window ledge 3.5 m above the sidewalk. How fast is the plant moving... (answered by Alan3354)
The kinetic energy E of a moving object is jointly proportional to the object’s mass m (answered by MathLover1)
How much work is done on 100 KG car that accelerate at 30M/s/s when it moved... (answered by ikleyn)
Can someone please help me with this problem: A 1-kg object is moving at 10 m/s. To... (answered by stanbon)