SOLUTION: A small firm produces both AM and AM/FM car radios. The AM radios take 15h to produce, and the AM/FM radios take 20h. THe number of production hours is limited to 300h per week. Th
Algebra.Com
Question 39486: A small firm produces both AM and AM/FM car radios. The AM radios take 15h to produce, and the AM/FM radios take 20h. THe number of production hours is limited to 300h per week. The plant's capacity is limited to a total of 18 radios per week, and existing orders require that at least 4 AM radios and
at least 3 AM/FM radios be produced per week. Write a system of inequalities representing this situation. X = number of AM radios and Y = number of AM/FM radios.
Answer by Nate(3500) (Show Source): You can put this solution on YOUR website!
X = number of AM radios and Y = number of AM/FM radios and H = hours of work
and
and
RELATED QUESTIONS
A small firm produces both AM and AM/FM car radios. The AM takes 15h to produce, and the... (answered by ankor@dixie-net.com)
A small firm produces both AM and AM/FM car radios. The AM radios take 15h to produce,... (answered by ankor@dixie-net.com)
A small firm produces both AM and AM/FM car radios. The AM radios take 15h to produce,... (answered by favegirl13,jim_thompson5910)
A small firm produces both AM and AM/FM car radios. The AM radio take 15h to produce, and (answered by ankor@dixie-net.com,josmiceli)
A small firm produces both AM and AM?FM car radios. The AM radios take 15 hours to... (answered by mbarugel)
This is a pretty big problem for me and was wondering if I could get some help with it.... (answered by stanbon)
I have tried to figure this out and have no idea! I can seperate out some of the... (answered by ankor@dixie-net.com)
A small firm produces both AM and AM/FM car radios. The AM radios take 15 h to produce,... (answered by stanbon)
20. A small firm produces both AM and AM/FM car radios. The AM radios take 15 h
to... (answered by ankor@dixie-net.com)