SOLUTION: between 15.000 yd 3 and 16.000 yd 3 of earth must be tucked away from a construction site . the trucks can remove 1000 yd 3 per day and 10.500 yd3 has already been removed how many

Algebra.Com
Question 1166539: between 15.000 yd 3 and 16.000 yd 3 of earth must be tucked away from a construction site . the trucks can remove 1000 yd 3 per day and 10.500 yd3 has already been removed how many days are needed
Answer by ikleyn(52776)   (Show Source): You can put this solution on YOUR website!
.

The remained amount of soil to remove is between 4500 yd^3 and 5500 yd^3.

Therefore, the answer to the problem's question is

    between  4.5 and 5.5 days.


Solved.



RELATED QUESTIONS

The lengths of two sides of a triangle are 4 yd and 8 yd. Which of the following connot... (answered by stanbon)
Which of the following sets of numbers could be the lengths of the side of a triangle (answered by richwmiller)
The perimeter of a rectangle is 36 yards and the length is 15 yards. What is the... (answered by macston)
the length {yd.} is 48 the width {yd.} is 1 the area P{yd.2} is 48 what is the... (answered by advanced_Learner)
find the area of the rectangle with the given base and height. 2 yd 3 in, 16... (answered by rfer)
Solve the problem by writing a compound inequality. Between 15000yd3 and 16000yd3 of... (answered by scott8148)
A sporting goods manufacturers requires 3/5 yd of fabric to make a pair of soccer shorts. (answered by Cromlix)
If r = 3 yd, and h = 5 yd, find the lateral area of the right cylinder. (answered by malakumar_kos@yahoo.com)
Landscaping: at an excavation site a conical pile of earth 9 ft high and 14 ft in... (answered by scott8148)