SOLUTION: At General Electric, shift 1 produced 4 times as much as shift 2. General Electric’s total production for the month of July was 5,500 jet engines. What was the output for each shif
Algebra.Com
Question 240422: At General Electric, shift 1 produced 4 times as much as shift 2. General Electric’s total production for the month of July was 5,500 jet engines. What was the output for each shift?
Answer by checkley77(12844) (Show Source): You can put this solution on YOUR website!
4X+X=5,500
5X=5,500
X=5,500/5
X=1,100 ANS. FOR THE OUTPUT FOR THE SHIFT 2.
5,500-1,100=4,400 ANS. FOR THE OUTPUT FOR THE SHIFT 1.
RELATED QUESTIONS
At General Electric, shift 1 produced 4 times as much as shift 2. General Electric's... (answered by ikleyn)
Honda day shift produced 4 times as much as shift 2. The total production for the month... (answered by Sarpi)
At GE shift 1 produced 4 times as much as shift 2. GE's total production for July was... (answered by bucky)
At Maplewood Marine, shift 1 produced 3 times as much as shift 2. Maplewood's total... (answered by ichudov)
At GE, shift one produced 4 times as much as shift two. GE's total production for July... (answered by edjones)
In Ajax Corporation, the first shift produced 4 1/2 times as many lightbulbs as the... (answered by stanbon)
In Ryan Corporation, the first shift produced 5 1/2 times as many lightbulbs as the... (answered by rfer,richwmiller)
Im having trouble determing if these are parametric or nonparametric
1. Once a month,... (answered by stanbon)
A furniture store produces three times as many beds on shift two as on shift one. If a... (answered by josgarithmetic)