Question 1182429: 3. A manufacturer packs sugar into plastic bags . Each bag is to hold 5 kgs whenever the production is under control. At one period, a sample of 17 bags was taken to check the process and was to found to weigh 5.6 kgs with SD of 0.75 kgs. Is the manufacturing process under control? Use 𝛼=0.01
Thanks in advance!

Answer by Boreal(15235)   (Show Source): You can put this solution on YOUR website!
This is a 2-way t-test, t=0.995, df=16
critical value is |t| < 2.947
t=( x bar-mean)/s/sqrt(n)
=(5.6-5)*sqrt(17)/0.75
=3.298
This value is greater than the critical value, so reject Ho and the process is not in control with the parameters desired.
p-value=0.0045
Notice that the p-value is < 0.01, which is another way to say Ho is rejected.

RELATED QUESTIONS

Give complete computation/solutions and 6 steps in solving. 1.A firm that manufactures (answered by ikleyn)
Two bags had 50kg each. After taking out 3 times as much sugar from bag A as bag B, bag A (answered by Boreal)
Two bags had 50kg each. After taking out 3 times as much sugar from bag A as bag B, bag A (answered by josmiceli)
three bags of sugar weighing 24 kg 36 kg and18kg are to be packed equal bags. the new... (answered by ikleyn)
A shipment of 9tons of sugar is separated into containers of equal size. If the shipment... (answered by ikleyn)
Jean had 24 kilos of dried mangoes to put into plastic bags. She put 3/4 kilo in each... (answered by josgarithmetic)
Two bags had 50 kilograms of sugar each. After taking out 3 times as much sugar from bag... (answered by josmiceli)
A machine is used to fill each of several bags with 16 ounces of sugar. After the bags... (answered by stanbon)
In 3 bags there is 64,2 kg of sugar. In the second bag there is 4/5 from the amount of... (answered by josgarithmetic)